Inspections for the day of: Tuesday, November 10, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01327 FIRE-Final Inspection11/10/200911/10/200911/10/2009 5:14:45 PMPPART
Discussed final inspection schedule and project related fire sprinkler permit work- final insp. set for 11/12 pm.
BLD08-02268 FIRE-Final Inspection11/10/200911/10/200911/10/2009 5:11:32 PMPPASS
Fire life safety finaled.
BLD09-01851 FIRE-Final Inspection11/10/200911/10/200911/10/2009 5:10:57 PMPPASS
Life safety final approved.
BLD09-01672 FIRE-Final Inspection11/9/200911/10/200911/10/2009 5:10:14 PMAPASS
Fire life safety is satisfactory.
BLD08-00181 FIRE-Final Inspection11/9/200911/10/200911/10/2009 5:09:45 PMAPASS
Fire life safety site inspection passed.
FIR09-00384 INSP-Sprinkler Rough-in11/9/200911/10/200911/10/2009 5:09:05 PMAPART
Inspection to verify insulation fill at four concealed spaces, added upright protection at the south side for exposed wood above the drop ceiling, and previous C/N items completed okay. Discussed hydrostatic testing and job finish schedule.
BLD09-01337 FIRE-Final Inspection11/9/200911/10/200911/10/2009 5:06:11 PMANR
Building life safety final pending project related fire alarm work.
FIR09-00587 INSP-Final Inspection11/9/200911/10/200911/10/2009 5:04:49 PMANR
Per contractor sync issues are not yet resolved.