Inspections for the day of: Tuesday, November 10, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01339 FIRE-Conference11/10/200911/10/200911/10/2009 3:27:12 PMPDONE
I went over life safety requirements with Chris Beutter. As verified with the plan reviewer the exit signs are required to have battery backup.
FIR09-00408 INSP-Sprinkler Rough-in/Hydro11/10/200911/10/200911/10/2009 3:12:15 PMPPART
The underground hydro test passed. The two overhead hydro tests failed.
BLD09-01685 FIRE-Final Inspection11/10/200911/10/200911/10/2009 2:44:11 PMPFAIL
Todays inspection was actually for a conference. The insulation at the deck has been repaired and the ceiling tile can be installed pending other trade inspections.
BLD09-01982 FIRE-Final Inspection11/9/200911/10/200911/10/2009 2:42:34 PMAFAIL
See the city approved plans for a list of deficiencies which include providing testing/verification of the smoke evac system, provide emergency lighting in the main sales floor area, repair the existing emergency lighting in the rear exit corridor and mount the fire extinguisher and provide a current inspection tag.
FIR09-00609 INSP-Final Inspection11/10/200911/10/200911/10/2009 1:44:36 PMPPASS
Permit finaled
FIR09-00571 INSP-Final Inspection11/10/200911/10/200911/10/2009 1:28:56 PMPPASS
Permit finaled