Inspections for the day of: Wednesday, November 10, 2010.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00837 Site Preparation11/10/201011/10/201011/10/2010 3:18:01 PM NR
ESC10-00803 BMP Violation11/9/201011/10/201011/10/2010 2:24:03 PMAPASS
ESC10-00809 Site Preparation11/5/201011/10/201011/10/2010 1:35:11 PMACANC
ESC10-00747 Site Preparation11/10/201011/10/201011/10/2010 1:34:41 PM PASS
ESC10-00010 Tracking Control11/10/201011/10/201011/10/2010 10:30:23 AMAFAIL
Notice given to Dave Powell w/ Dallas Harris:
1. Provide a stabilized staging area where, maintianing, staging and fueling can occur on equipment with a stabilized access to minuimize tracking to the maximium extent practible on the north east end of Warm Springs Ave project area.
Clean up all tracking that is involve with the project area.
**Failure to comply with the given time frame will result in a stop work order.** Will re-inspect on 11/15/2010PM.