ESC13-00152
| Aging Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 4:25:28 PM | | PASS |
|
|
Garage structure is complete and no further foundation or exterior work needed. BLD open, however yard is landscaped and all previous excavation stabilized. No additional ESC inspections necessary. ESC permit conditions satisfied.
|
ESC13-00152
| DOC - Permit Finaled | 11/10/2014 | 11/10/2014 | 11/10/2014 4:24:00 PM | P | PASS |
|
|
|
ESC13-00811
| Aging Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 4:02:50 PM | | PASS |
|
|
No activity or remaining disturbed areas at site. Yard is completely landscaped. No activity on open BLD in over 1 year. ESC permit finaled.
|
ESC13-00811
| DOC - Permit Finaled | 11/10/2014 | 11/10/2014 | 11/10/2014 4:00:12 PM | P | PASS |
|
|
|
ESC14-00848
| Random Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 3:27:28 PM | P | PASS |
|
|
Pool installation with retaining wall is still in progress. No trackout or erosion issues at site, but will need to stablize adjacent lot and remove temporary BMPs.
|
ESC14-00614
| General Inspection | 11/7/2014 | 11/10/2014 | 11/10/2014 3:24:42 PM | A | PEND |
|
|
Permit posted, no trackout. Crew working during inspection swept sidewalks during my visit.
Checked installation of the erosion control blanket and observed no current issues and that it is stapled in to the ground. Need to trench in top of blanket to anchor it. Called RP-GC to see if seed had been applied before installing blanket.
No issues at this time, but left VM to Don Flynn regarding the ECB installation.
|
ESC14-00759
| Site Preparation | 11/10/2014 | 11/10/2014 | 11/10/2014 3:04:41 PM | P | PASS |
|
|
After receiving warning, GC Matt Brown stopped work and installed perimeter silt fencing, posted permit, and is currently working on regrading the entrance to the lot to install a tracking pad.
No sediment or discharges leaving the site, discussed project with Matt. Approved to continue.
|
ESC12-00364
| General Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 2:01:38 PM | | PASS |
|
|
No further earth disturbance for new construction. Still need final landscaping stabilization and BLD is still open. No ESC corrections needed.
|
ESC14-00106
| General Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 1:44:27 PM | | PASS |
|
|
WIP. Landscaping being installed. No trackout or sediment leaving site.
The complaint inspection conducted on 10/9 regarding the "road" installed on the adjacent lot has been resolved. The disturbed area has been hydroseeded and wattle will be removed once vegetation is fully established. Approved.
|
ESC14-01005
| Site Preparation | 11/10/2014 | 11/10/2014 | 11/10/2014 1:26:42 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted and current Tahoe homes projects are in very condition. No trackout or sediment leaving site. Contractors have been utilizing the East Valley lined washout pit which has been relocated to the upper left corner from entrance, which is good because it is higher ground and less likely to flood with stormwater. No activity at time of inspection.
Approved for excavation when ready.
|
ESC13-00793
| Aging Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 1:15:55 PM | | PASS |
|
|
No trackout at entrance of Terraces laydown/staging yard. No stormwater discharges from site observed. Perimeter has chain link fencing, silt fence, and earthen berm. See ESC14-00755 for Terraces main project site.
No corrections at this time.
|
ESC14-00486
| Random Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 12:04:31 PM | P | PASS |
|
|
Crews in process of pouring asphalt for parking lot. No work on car wash or across Cole at this time. Minimal trackout to Cole (ACHD is currently repaving) and no discharges. Approved.
|
ESC14-00300
| General Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 12:02:37 PM | | PASS |
|
|
WIP on LHM Collision Center. No sediment or discharges leaving site. Vertical construction in progress. Drop inlets have filter bag containment protection and ESC permit posted visibly on security fencing. No corrections at this time.
|
ESC13-01182
| General Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 11:49:33 AM | | PASS |
|
|
ITEC building construction is complete and BLD permit has been finaled. Some related site improvents such as paving the access road to ITEC from Targhee is still in progress. No ESC violations or issues. Should be ready for site final next general inspection.
|
ESC12-00447
| Aging Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 11:27:49 AM | | PASS |
|
|
Abode subdivision development is fully constructed and nearly all lots are filled with completed homes. Harding Construction has several SFH permits active at this time and they will remove drop inlet filter bags.
No further ESC inspections necessary for this permit. Permit finaled.
|
ESC12-00447
| DOC - Permit Finaled | 11/10/2014 | 11/10/2014 | 11/10/2014 11:25:59 AM | P | PASS |
|
|
|
ESC14-00212
| Complaint Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 11:13:52 AM | P | PASS |
|
|
ACHD ESC Inspector reported that site was now dewatering into MS4. Upon further investigation it turned out the water was from drinking water line flushing by United Water - which is a permitted disharge per stormwater ordinance. Water was picking up sediment from street and nearby stockpile so we stopped flushing and had them run a hose directly into DI to prevent co-mingling with sediment. Change was made and resolved problem.
Checked dewatering operation and one pump was flowing and dishage looked within limits. I requested they keep logging samples and monitor. Water downstream in Ann Morrison creek appears to clear. ACHD will return for turbidity sample.
No corrections at this time, complaint issue resolved.
M
|
ESC14-01039
| Site Final | 11/10/2014 | 11/10/2014 | 11/10/2014 11:08:23 AM | P | PASS |
|
|
Vault installation and associated dewatering is complete. Street has been patched and cleaned, silt bag and hose removed and installation area is not damaged. No further discharges or work. Permit finaled.
|
ESC14-01039
| DOC - Permit Finaled | 11/10/2014 | 11/10/2014 | 11/10/2014 11:07:06 AM | P | PASS |
|
|
|
ESC13-00345
| General Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 10:04:19 AM | | PASS |
|
|
Warehouse and hangar construction is complete, all utility and parking areas are stabilized/paved. Landscaping along Aeronica complete and temp BMPs removed. ESC permit finaled.
|
ESC13-00345
| DOC - Permit Finaled | 11/10/2014 | 11/10/2014 | 11/10/2014 9:58:15 AM | P | PASS |
|
|
|
ESC13-00710
| DOC - Permit Finaled | 11/10/2014 | 11/10/2014 | 11/10/2014 9:52:58 AM | P | PASS |
|
|
|
ESC13-00710
| Site Final | 11/10/2014 | 11/10/2014 | 11/10/2014 9:52:40 AM | P | PASS |
|
|
Construction complete. Parking lot paved and landscaping installed. No loose sediment or construction materials at site. All permits finaled. ESC conditions satisfied.
|
ESC13-01160
| General Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 9:37:58 AM | | PASS |
|
|
WIP. Parking lot is about to be paved so construction entrance has been removed. Some minor trackout but DIs have sediment containment protection. No corrections required at this time.
|
ESC14-00237
| Random Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 9:11:15 AM | P | PASS |
|
|
Work has started on pavillion within church parking lot. Receiving DI has filter bag protection. No sediment leaving site, no stormwater pollution sources.
|
ESC13-00952
| Aging Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 9:08:07 AM | | PASS |
|
|
Garage addition has been framed in, yet BLD is open with no activity in 6 months. No further earth disturbance or current ESC issues. Construction area is stabilized. ESC permit finaled.
|
ESC13-00952
| DOC - Permit Finaled | 11/10/2014 | 11/10/2014 | 11/10/2014 9:06:59 AM | P | PASS |
|
|
|