ELE16-01789
| Final | 11/9/2016 | 11/10/2016 | 11/14/2016 1:27:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mike Leonard final ok
|
ELE16-02581
| Final | 11/9/2016 | 11/10/2016 | 11/10/2016 12:07:23 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman final ok
|
ELE16-02368
| Final | 11/9/2016 | 11/10/2016 | 11/10/2016 11:44:01 AM | A | PASS |
|
|
call ahead for access; Aaron Phone #: ###-#### final ok
|
GCE16-00004
| GCE-Rough-In | 11/9/2016 | 11/10/2016 | 11/10/2016 11:02:56 AM | A | PASS |
|
|
Bob ###-#### - receptionist desk and rooftop area Rough in cover reception desk only. Contractor called in Partial final for rooftop units.
|
ELE16-03640
| Conference | 11/9/2016 | 11/10/2016 | 11/10/2016 9:39:18 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Ormond Rankin Discussed outlet layout and ARC fault protection
|
ELE16-03658
| Electrical Rough-In | 11/9/2016 | 11/10/2016 | 11/10/2016 9:20:01 AM | A | PASS |
|
|
installed 4 six inch remodel cans, and 2 four inch new construction cans controlled by existing wall switch Phone #: ###-#### Inspection requested via web by steve sellers rough ok cover
|
ELE16-01543
| Final | 11/9/2016 | 11/10/2016 | 11/10/2016 8:57:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Terry Scott final ok
|