Inspections for the day of: Friday, November 12, 1999.
Number of inspections: 30
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02519 BLD-Energy code compliance11/12/199911/12/199911/16/1999 12:00:00 AMPPASS
donna ###-#### energy code insp EC ok.
BLD99-01410 BLD-Framing/Rough-in11/11/199911/12/199911/15/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/11/1999 at 12:17:42. Contact: ###-####. Work not complete.
BLD99-03112 BLD-Footing11/12/199911/12/199911/15/1999 12:00:00 AMPPART
kurt ###-#### Found wall, part- townhouse.
BLD99-03256 BLD-Energy code compliance11/12/199911/12/199911/15/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/12/1999 at 08:09:36. Contact: . BEC ok.
BLD99-02706 BLD-Final11/11/199911/12/199911/15/1999 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 11/11/1999 at 08:55:13. Contact: ###-####. PM need elec. Final etc.
BLD99-01152 BLD-Final11/10/199911/12/199911/15/1999 12:00:00 AMPFAIL
tracy ###-#### Need fire alarms.
BLD99-01087 BLD-Framing/Rough-in11/12/199911/12/199911/15/1999 12:00:00 AMPPASS
wert ###-#### fr insp
BLD99-01088 BLD-Framing/Rough-in11/12/199911/12/199911/15/1999 12:00:00 AMPPASS
wert ###-#### fr insp
BLD98-01756 BLD-Foundation11/11/199911/12/199911/12/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/11/1999 at 07:14:22. Contact: . Contractor called an canceled will resched.
BLD99-03106 BLD-Energy code compliance11/11/199911/12/199911/12/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/11/1999 at 08:33:15. Contact: ###-####. Frame ok/ energy code C/N posted.
BLD99-03082 BLD-Energy code compliance11/11/199911/12/199911/12/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/11/1999 at 08:36:00. Contact: ###-####. Previous C/N ok on framing, C/N posted for energy code.
BLD99-01785 BLD-Framing/Rough-in11/8/199911/12/199911/12/1999 12:00:00 AMAPART
mark ###-#### masonary grout insp S/I no stop.
BLD99-03185 BLD-Foundation11/10/199911/12/199911/12/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/10/1999 at 08:24:43. Contact: ###-####. $42.00 fee N/R no forms in hole.
BLD99-02997 BLD-Final11/10/199911/12/199911/12/1999 12:00:00 AMAFAIL
larry ###-#### No cable for corridor door per plan.
BLD99-01832 BLD-Final11/10/199911/12/199911/12/1999 12:00:00 AMAPASS
carolyn ###-#### #15 L/C ok final ok.
BLD99-03327 BLD-Final11/10/199911/12/199911/12/1999 12:00:00 AMANR
backfill dirt ron ###-#### ###-#### cell Work in progress re-call.
BLD99-02518 BLD-Footing11/10/199911/12/199911/12/1999 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/10/1999 at 14:24:17. Contact: ###-####. Placed W/SI on 11/11/99 pending report.
BLD99-02021 BLD-Other11/11/199911/12/199911/12/1999 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/11/1999 at 12:02:25. Contact: ###-####. Engineer to address undermining of structure column East wall and short Achor Bolt must values.
BLD99-03098 BLD-Framing/Rough-in11/11/199911/12/199911/12/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/11/1999 at 10:08:23. Contact: . No ele. Or mech. Insp. No stickers no stop.
BLD99-03099 BLD-Framing/Rough-in11/11/199911/12/199911/12/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/11/1999 at 10:13:08. Contact: ###-####. No heating insp. No sticker no stop.
BLD99-02700 BLD-Final11/12/199911/12/199911/12/1999 12:00:00 AMPFAIL
dana-- ###-#### fn occ Address # need and Ele. Final.
BLD98-03430 BLD-Framing/Rough-in11/12/199911/12/199911/12/1999 12:00:00 AMPPART
###-#### bill fr insp Pending Ele. Ok to insulate after Ele. Approval.
BLD99-02554 BLD-Final11/10/199911/12/199911/12/1999 12:00:00 AMPCANC
saul ###-#### fn occ last one??????
BLD99-01694 BLD-Final11/12/199911/12/199911/12/1999 12:00:00 AMPFAIL
george ###-#### No access no contact of # supplied.
BLD99-02327 BLD-Framing/Rough-in11/12/199911/12/199911/12/1999 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/12/1999 at 09:00:10. Contact: ###-####. Covered by special inspection pend. Report.
BLD99-01860 BLD-Final11/12/199911/12/199911/12/1999 12:00:00 AMPFAIL
sabrina--- ###-#### fn occ Tran to Russ.
BLD99-03217 BLD-Footing11/12/199911/12/199911/12/1999 12:00:00 AMPFAIL
around 1:30 or 2:00 no phone # Trans to P. Paine pm.
BLD99-03140 BLD-Framing/Rough-in11/12/199911/12/199911/12/1999 12:00:00 AMPPART
#1173 greg ###-#### C/N pend Ele.; ok to Ruck specified areas.
BLD99-03327 BLD-Final11/12/199911/12/199911/12/1999 12:00:00 AMPFAIL
ron ###-#### Called to reschedule "Monday"
BLD99-03081 BLD-Framing/Rough-in11/12/199911/12/199911/12/1999 12:00:00 AMPFAIL
C/N ok to insulate, sheer pawrvels failed nailing and plan configuration.