Inspections for the day of: Friday, November 12, 1999.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorGary Ziegler
TitlePLM-INSPECTOR
Phone #794-9379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM99-03752 Plumbing Rough-in11/10/199911/12/199911/12/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/10/1999 at 12:07:36. Contact: ###-####.
PLM99-03314 Final11/10/199911/12/199911/12/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/10/1999 at 14:45:05. Contact: ###-####.
PLM99-02868 Final11/10/199911/12/199911/12/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/10/1999 at 16:35:31. Contact: ###-####.
PLM99-01098 Final11/11/199911/12/199911/12/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/11/1999 at 08:15:57. Contact: ###-####. Pipe relief line to floor sink, fix everything on sump pump, cert. Backflow device onn heating system.
PLM99-03443 Plumbing Rough-in11/11/199911/12/199911/12/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/11/1999 at 17:00:17. Contact: ###-####.
PLM99-03741 Plumbing Rough-in11/12/199911/12/199911/12/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/12/1999 at 07:52:25. Contact: ###-####.
PLM99-02939 Plumbing Rough-in11/12/199911/12/199911/12/1999 12:00:00 AMPPASS
conference please call before going out darla ###-#### Conference.
PLM99-03818 Water and/or Sewer11/12/199911/12/199911/12/1999 12:00:00 AMPPASS
larry-- ###-#### swr only insp
PLM99-03581 Plumbing Rough-in11/11/199911/12/199911/12/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/11/1999 at 12:31:12. Contact: .