BLD98-02368
| BLD-Framing/Rough-in | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | FAIL |
|
|
Iran ###-#### Call first to meet there Left corrections.
|
BLD99-01810
| BLD-Final | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
bryan ###-####
|
MEC99-02929
| Final | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
debbie ###-####
|
BLD99-01683
| BLD-Final | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 16:49:52. Contact: . LC #16915
|
BLD99-01995
| BLD-Framing/Rough-in | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 16:50:53. Contact: . Ok to side.
|
BLD99-02266
| BLD-Other | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 16:51:50. Contact: . Ok to sheetrock.
|
BLD99-02364
| BLD-Framing/Rough-in | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | NR |
|
|
###-#### this was needed to be done wednesday noone could get to it please do asap. No approved plans or truss detail called ###-####; no answer.
|
BLD99-02590
| BLD-Framing/Rough-in | 11/11/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/11/1999 at 09:53:46. Contact: . No plans.
|
MEC99-03062
| Final | 11/11/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/11/1999 at 10:24:26. Contact: ###-####.
|
MEC99-03226
| Final | 11/11/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/11/1999 at 14:40:50. Contact: ###-####.
|
BLD99-02629
| BLD-Framing/Rough-in | 11/11/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/11/1999 at 15:34:08. Contact: ###-####.
|
BLD99-03286
| BLD-Foundation | 11/11/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/11/1999 at 16:20:18. Contact: ###-####. Footings.
|
MEC99-03778
| Rough-in | 11/11/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/11/1999 at 17:25:46. Contact: ###-####.
|
BLD99-01423
| BLD-Final | 11/11/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/11/1999 at 18:09:39. Contact: ###-####. Left corrections.
|
BLD99-02374
| BLD-Framing/Rough-in | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/12/1999 at 07:02:03. Contact: ###-####.
|
BLD99-02386
| BLD-Energy code compliance | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/12/1999 at 07:03:38. Contact: ###-####.
|
MEC99-03618
| Rough-in | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Firedamper required at exercise room.
|
MEC99-03618
| Final | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
###-#### Gas log fireplace.
|
MEC99-03760
| Final | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 13:38:13. Contact: ###-####. Left note to recall, not home.
|
MEC99-02263
| Final | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | PASS |
|
|
Re-insp.
|
BLD99-03315
| BLD-Foundation | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | A | FAIL |
|
|
Walls poured with-out inspection, foam boards already striped off.
|
BLD99-03008
| BLD-Other | 11/10/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 11:06:32. Contact: ###-####. Unable to do called and told them to recall.
|
BLD99-02073
| BLD-Framing/Rough-in | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | P | CANC |
|
|
ron ###-#### reinspect Called and told them to recall.
|
BLD99-02526
| BLD-Framing/Rough-in | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | P | PASS |
|
|
shear wall insp---steve ###-#### Ok to side.
|
BLD99-02431
| BLD-Final | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | P | CANC |
|
|
larry ###-#### Unable to do call and told them to recall.
|
BLD99-02687
| BLD-Energy code compliance | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | P | PASS |
|
|
john ###-#### Ok to sheetrock.
|
BLD99-02688
| BLD-Energy code compliance | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | P | PASS |
|
|
john ###-#### Ok to sheetrock.
|
MEC99-03189
| Final | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/12/1999 at 11:18:39. Contact: ###-####.
|
BLD99-01861
| BLD-Final | 11/12/1999 | 11/12/1999 | 11/12/1999 12:00:00 AM | P | FAIL |
|
|
Need code compling handrails at stairs to room over garage. Also need 4"max spacing at spame stairs, as written prior.
|
BLD99-03315
| BLD-Foundation | 11/10/1999 | 11/12/1999 | 11/10/1999 12:00:00 AM | A | PASS |
|
|
MANA ###-#### FOUND WALL. Instructed to take photographs and verify hold-downs.
|