MEC02-03284
| Pressure Test | 11/8/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | A | PASS |
|
|
sandy-- ###-####--call 1st before insp
|
MEC02-03105
| Pressure Test | 11/11/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 10:51:02. Contact: ###-####. ...this permit for existing gas line only...no equipment inspected 11/12/2002 10:12:48 AM
|
MEC02-02514
| Final | 11/11/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 15:24:52. Contact: ###-####.
|
MEC02-02065
| Final | 11/11/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Trina Stracener
|
MEC02-02621
| Rough-in | 11/8/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | A | PART |
|
|
sharon ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...###-####...darin 11/12/2002 9:02:34 AM 4 main lines from basement up through shaft to 5th floor ok..100lb and holding 11/12/2002 12:10:30 PM
|
MEC02-02402
| Conference | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | A | PASS |
|
|
60lb test ok ..tested before..tag was removed 11/12/2002 7:10:42 PM
|
MEC02-02372
| Final | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | P | FAIL |
|
|
fn -jerry- ###-#### ..posted corrections...gen cont called jerry 11/13/2002 10:16:50 AM
|
MEC02-00412
| Final | 11/8/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | P | CANC |
|
|
requested Dixie ###-#### talked to cont..will reschedule 11/14/2002 7:04:47 AM
|
MEC02-03271
| Pressure Test | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 06:58:36. Contact: ###-####. 60lb test kitchen area ok 11/12/2002 2:53:11 PM
|
MEC02-03112
| Rough-in | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | P | PART |
|
|
pLEASE CALL CHAD THANKS; Phone #: ###-#### Internet Inspection Request from: Amanda Van Paepeghem ceiling cover ok 11/12/2002 2:53:22 PM
|
MEC02-03224
| Rough-in | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | P | PASS |
|
|
Chad tried to call in on phone line for inspection yesterday oopps! Need rough-in for as early afternoon as possible. Thanks :); Phone #: ###-#### Internet Inspection Request from: Lisa Whitney ask chad about fresh air..on final 11/12/2002 7:11:05 PM
|
MEC02-01722
| Pressure Test | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 08:14:20. Contact: ###-####. 60lb main to roof ok 11/12/2002 2:54:24 PM
|
MEC02-02218
| Final | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | P | PART |
|
|
Pls call Stan. Structural inspect needs to be comp after mech today please thanks; Phone #: ###-#### Internet Inspection Request from: Amanda Van Paepeghem temp occ ok..waiting on engineer about dryer vent fan 11/12/2002 2:19:00 PM
|