BLD02-00257
| FIRE-Final Inspection | 11/11/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | A | PASS |
|
|
fire life/safety finaled 11/12/2002 9:58:49 AM
|
BLD02-01188
| FIRE-Conference | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | A | DONE |
|
|
I spoke to Jim with Steed Construction and notified him that the temp occ. for this project expires next wednesday
|
FIR02-00381
| INSP-Sprinkler Rough-in/Hydro | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | P | PART |
|
|
24 hour air test on the dry system. The gauge reads just under 42 lbs and the clock started at 1:00 pm
|
BLD02-00031
| FIRE-Final Inspection | 11/12/2002 | 11/12/2002 | 11/12/2002 12:00:00 AM | P | FAIL |
|
|
provide fire alarm drawings 11/12/2002 3:59:01 PM
|
BLD02-01055
| FIRE-Final Inspection | 11/8/2002 | 11/12/2002 | 11/11/2002 12:00:00 AM | A | CANC |
|
|
greg-re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Disp set to [CANC] by a contractor via Hello! on 11/11/2002 at 16:45:31.
|