ELE03-03563
| Electrical Rough-In | 11/10/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 11:05:40 AM. Contact: ###-####. u/g and walls 11/12/2003 10:34:34 AM
|
ELE02-02264
| Electrical Rough-In | 11/10/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | PASS |
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok 11/12/2003 8:48:44 AM
|
ELE03-03327
| Permanent Service | 11/10/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 3:04:44 PM. Contact: ###-####. p/s u/g new meter ok 11/12/2003 9:48:53 AM
|
ELE03-03327
| Electrical Rough-In | 11/10/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 3:05:33 PM. Contact: ###-####. ceil;ing ok 11/12/2003 9:49:31 AM
|
ELE03-03329
| Permanent Service | 11/10/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 3:07:36 PM. Contact: ###-####. p/s u/g new meter ok 11/12/2003 9:48:10 AM
|
ELE03-03328
| Permanent Service | 11/10/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 3:09:32 PM. Contact: ###-####. p/s u/g new meter ok 11/12/2003 9:48:31 AM
|
ELE03-03372
| Electrical Rough-In | 11/10/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 3:11:10 PM. Contact: ###-####. exterior walls ok 11/12/2003 9:49:46 AM
|
ELE03-00639
| Final | 11/10/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | FAIL |
|
|
###-#### cory cor. posted called 250.32(B)(1) isolate grds and neutrals at shop service 11/12/2003 8:30:04 AM
|
ELE03-02814
| Final | 11/10/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | PASS |
|
|
Terry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok 11/12/2003 10:34:42 AM
|
ELE03-03533
| Permanent Service | 11/12/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | A | PASS |
|
|
p/s u/g new ok meter 11/12/2003 9:47:50 AM
|
ELE03-03595
| Electrical Rough-In | 11/12/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | P | FAIL |
|
|
###-#### Chris cor. posted called 210.52(A) 300.4 (A)(1)&(D), 314.16, 408.21, B.C.C. all wiring shall be complete, and plans that match the framing 11/12/2003 3:17:40 PM
|
ELE03-03602
| Electrical Rough-In | 11/12/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | P | FAIL |
|
|
###-#### Jim cor. posted called 300.4 nail plates and 11/4" , 250.24(A)(5) isolate geds and neuts at sub panel, 300.10 loose set screws, 110.12(A) seal unused KOs, 300.11(B)&(C) shall not support cables from raceways or cables, 10.3 use approved means to secure cables and raceways no tie wire allowed 11/12/2003 2:02:41 PM
|
ELE03-02786
| Final | 11/12/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | P | PASS |
|
|
Please call for access//pat; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok 11/12/2003 12:39:58 PM
|
ELE03-02606
| Final | 11/12/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | P | PASS |
|
|
Please call for access//pat; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok 11/12/2003 12:40:12 PM
|
ELE03-03593
| Electrical Rough-In | 11/12/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | P | FAIL |
|
|
###-#### Dan --- please call first ###-#### homeowner for access John. r/i p/s failed cor posted called manufactures breakers only sub panel, 2 grd rods, 4 wire feed to range, range and dryer need 4 wire plug and pigtail, isolate grds and neuts at jbox basement, seal all unused openings 11/12/2003 4:47:14 PM
|
ELE03-02591
| Electrical Rough-In | 11/12/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | P | PASS |
|
|
joe- ###-#### ceilings ok 11/12/2003 1:35:27 PM
|
ELE03-02472
| Electrical Rough-In | 11/12/2003 | 11/12/2003 | 11/12/2003 12:00:00 AM | P | PART |
|
|
bud; Phone #: ###-#### Internet Inspection Request from: Annette Moore walls 1st and 2nd floors ok 11/12/2003 4:10:38 PM
|