ESC08-00931
| Conference | 11/12/2008 | 11/12/2008 | 11/12/2008 5:05:25 PM | P | DONE |
|
|
|
ESC08-00924
| Conference | 11/10/2008 | 11/12/2008 | 11/12/2008 1:42:44 PM | A | DONE |
|
|
Met with Sommer RP, (Karl) and Boise City Qualified Person, (Rocky) and Inspector 460. Reviewed project and discussed dewatering. Reviewed ESC plan, made comments and suggestions. Stressed the importance of staying on top of administration requirements per CGP. Made it clear that prior to any discharges offsite and into the river that water must meet water quality standards, (50 NTU's above background). Suggested the use of a turbidity meter to record and log any discharges and if these number exceed standards to stop discharging even if the pumps have to be shut down.
|