BLD09-00670
| BLD-Framing/Rough-in | 11/12/2009 | 11/12/2009 | 11/16/2009 1:18:06 PM | P | DONE |
|
|
Pat Records Phone #: ###-####
|
BLD09-00717
| BLD-Framing/Rough-in | 11/12/2009 | 11/12/2009 | 11/13/2009 11:14:10 AM | P | PART |
|
|
Pat Records Phone #: ###-#### ok to cover as trades get approved
|
BLD09-01117
| BLD-Final | 11/12/2009 | 11/12/2009 | 11/12/2009 5:34:55 PM | P | DONE |
|
|
|
BLD09-00283
| BLD-Conference | 11/12/2009 | 11/12/2009 | 11/12/2009 4:37:05 PM | P | PASS |
|
|
DAVID Phone #: ###-#### conf on final,, need trades,, floor does not have to be done
|
BLD09-01106
| BLD-Conference | 11/12/2009 | 11/12/2009 | 11/12/2009 4:15:51 PM | P | PART |
|
|
Phone #: ###-#### ok to roof and side
|
BLD08-01909
| BLD-Final | 11/12/2009 | 11/12/2009 | 11/12/2009 3:57:21 PM | P | FAIL |
|
|
ED Phone #: ###-####--Please call at least 30 mins prior to inspection need egress out of bedroom,, plans
|
BLD07-03284
| BLD-Foundation | 11/10/2009 | 11/12/2009 | 11/12/2009 3:21:19 PM | A | DONE |
|
|
Kevin-around 3 if possible please Phone #: ###-#### poured over veterans day,, appears ok
|
ESC07-01158
| General Inspection | 11/12/2009 | 11/12/2009 | 11/12/2009 3:19:36 PM | P | DONE |
|
|
check status of job
|
ESC07-01158
| DOC - Permit Finaled | 11/12/2009 | 11/12/2009 | 11/12/2009 3:15:28 PM | P | PASS |
|
|
|
BLD09-01604
| BLD-Energy code compliance | 11/12/2009 | 11/12/2009 | 11/12/2009 2:42:17 PM | P | PASS |
|
|
LARRY Phone #: ###-####
|
BLD09-00710
| BLD-Energy code compliance | 11/12/2009 | 11/12/2009 | 11/12/2009 2:05:56 PM | P | PART |
|
|
Ernie Phone #: ###-#### change on exterior needs approved
|
ESC07-01602
| Site Preparation | 11/10/2009 | 11/12/2009 | 11/12/2009 1:24:18 PM | A | FAIL |
|
|
STILL TRACKING ISSUES,, SIGN IS POSTED NOW
|