Inspections for the day of: Thursday, November 12, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00965 FIRE-Final Inspection11/12/200911/12/200911/12/2009 3:34:24 PMPPASS
Life safety passed.
FIR09-00484 INSP-Sprinkler Rough-in/Hydro11/10/200911/12/200911/12/2009 2:33:56 PMAPASS
All of the sprinkler piping can be covered except in the show room area.
BLD09-01856 FIRE-Conference11/10/200911/12/200911/12/2009 2:19:30 PMADONE
I went over the life safety requirements for this project with the general contractor.
BLD09-01982 FIRE-Final Inspection11/12/200911/12/200911/12/2009 11:31:18 AMAFAIL
The damper for the smoke evac system failed to operate when the smoke detector was activated. The other items have been corrected.
BLD09-01479 FIRE-Final Inspection11/10/200911/12/200911/12/2009 11:29:53 AMAFAIL
One exit sign/emergency light did not function and the thumbturn lock needs removed at the main exit as discussed
FIR09-00422 INSP-Final Inspection11/11/200911/12/200911/12/2009 10:01:32 AMAPASS
Permit finaled. Deficiencies corrected.