Inspections for the day of: Tuesday, November 12, 2013.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-01286 FIRE-Sprinkler Rough-in11/11/201311/12/201311/12/2013 3:49:35 PMPFAIL
Tenting inspection failed due to many problem areas. I left a voice message for Mike. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD13-02948 FIRE-Final Inspection11/8/201311/12/201311/12/2013 3:44:56 PMAPART
A temporary occupancy, per Jason Blaise, for the warehouse area is approved until the remaining work is complete.
BLD13-02101 FIRE-Final Inspection11/12/201311/12/201311/12/2013 3:43:35 PMPPASS
Life safety passed. I spoke to Mike Jordan about the manual lock on the main door inactive leaf.
FIR13-00427 INSP-Sprinkler Rough-in11/12/201311/12/201311/12/2013 2:56:43 PMPPASS
See the city approved plans for locations marked "ok" where piping is ok to cover.
BLD13-03110 FIRE-Final Inspection11/12/201311/12/201311/12/2013 2:41:46 PMPPASS
life safety passed
FIR13-00341 INSP-Sprinkler Rough-in/Hydro11/11/201311/12/201311/12/2013 2:06:18 PMPPASS
The overhead hydro passed. Tenting passed. Piping can be covered. Two pendants on the first floor need to be relocated so as no to be more than 10' from any one wall. These heads will be checked at the final per discussion.
FIR13-00339 INSP-Sprinkler Rough-in/Hydro11/11/201311/12/201311/12/2013 1:11:25 PMPCANC
Underground hydro is not required.
FIR13-00337 INSP-Sprinkler Rough-in/Hydro11/11/201311/12/201311/12/2013 1:10:33 PMPCANC
Underground hydro not required
FIR13-00599 INSP-Sprinkler Rough-in11/12/201311/12/201311/12/2013 12:47:55 PMPPASS
Underground piping is ok to cover.
FIR13-00378 INSP-Final Inspection11/12/201311/12/201311/12/2013 11:37:55 AMPCANC
Not ready for final inspection. Rough-in passed except for two overspace pendants. See rough-in inspection notes.
FIR13-00378 INSP-Sprinkler Rough-in/Hydro11/12/201311/12/201311/12/2013 11:29:21 AMPPASS
Rough-in passed. Will verify the two pendants next to the west wall are with-in 7'-6" of the wall at final.
FIR13-00576 INSP-Sprinkler Rough-in11/12/201311/12/201311/12/2013 10:59:08 AMPPART
Re-submitt plans showing the arm-overs on the 2" overhead lines which could affect hydraulic calculations as being more demanding than the existing remote area.. Provide branchline restraints. Provide E.Q. bracing as discussed in the riser room. Provide upright sprinkler head in the entry canopy as discussed. Sprinkler piping in the restrooms is ok to cover and the general installation of the overhead lines is passed.
FIR13-00623 INSP-Final Inspection11/8/201311/12/201311/12/2013 10:12:00 AMAPASS
Permit finaled
BLD13-03002 FIRE-Final Inspection11/12/201311/12/201311/12/2013 10:03:18 AMPPASS
Life safety passed
FIR13-00386 INSP-Final Inspection11/11/201311/12/201311/12/2013 9:34:31 AMAPASS
Permit finaled
FIR13-00360 INSP-Final Inspection11/7/201311/12/201311/12/2013 9:33:04 AMAPASS
Permit finaled. Jason to provide as-builts to lee showing the change from 15cd to 30cd in the Copy area.
BLD13-02961 FIRE-Final Inspection11/6/201311/12/201311/12/2013 9:01:17 AMAPASS
Life safety passed. Owner to repair or remove the emergency light