BLD13-01286
| FIRE-Sprinkler Rough-in | 11/11/2013 | 11/12/2013 | 11/12/2013 3:49:35 PM | P | FAIL |
|
|
Tenting inspection failed due to many problem areas. I left a voice message for Mike. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
BLD13-02948
| FIRE-Final Inspection | 11/8/2013 | 11/12/2013 | 11/12/2013 3:44:56 PM | A | PART |
|
|
A temporary occupancy, per Jason Blaise, for the warehouse area is approved until the remaining work is complete.
|
BLD13-02101
| FIRE-Final Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 3:43:35 PM | P | PASS |
|
|
Life safety passed. I spoke to Mike Jordan about the manual lock on the main door inactive leaf.
|
FIR13-00427
| INSP-Sprinkler Rough-in | 11/12/2013 | 11/12/2013 | 11/12/2013 2:56:43 PM | P | PASS |
|
|
See the city approved plans for locations marked "ok" where piping is ok to cover.
|
BLD13-03110
| FIRE-Final Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 2:41:46 PM | P | PASS |
|
|
life safety passed
|
FIR13-00341
| INSP-Sprinkler Rough-in/Hydro | 11/11/2013 | 11/12/2013 | 11/12/2013 2:06:18 PM | P | PASS |
|
|
The overhead hydro passed. Tenting passed. Piping can be covered. Two pendants on the first floor need to be relocated so as no to be more than 10' from any one wall. These heads will be checked at the final per discussion.
|
FIR13-00339
| INSP-Sprinkler Rough-in/Hydro | 11/11/2013 | 11/12/2013 | 11/12/2013 1:11:25 PM | P | CANC |
|
|
Underground hydro is not required.
|
FIR13-00337
| INSP-Sprinkler Rough-in/Hydro | 11/11/2013 | 11/12/2013 | 11/12/2013 1:10:33 PM | P | CANC |
|
|
Underground hydro not required
|
FIR13-00599
| INSP-Sprinkler Rough-in | 11/12/2013 | 11/12/2013 | 11/12/2013 12:47:55 PM | P | PASS |
|
|
Underground piping is ok to cover.
|
FIR13-00378
| INSP-Final Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 11:37:55 AM | P | CANC |
|
|
Not ready for final inspection. Rough-in passed except for two overspace pendants. See rough-in inspection notes.
|
FIR13-00378
| INSP-Sprinkler Rough-in/Hydro | 11/12/2013 | 11/12/2013 | 11/12/2013 11:29:21 AM | P | PASS |
|
|
Rough-in passed. Will verify the two pendants next to the west wall are with-in 7'-6" of the wall at final.
|
FIR13-00576
| INSP-Sprinkler Rough-in | 11/12/2013 | 11/12/2013 | 11/12/2013 10:59:08 AM | P | PART |
|
|
Re-submitt plans showing the arm-overs on the 2" overhead lines which could affect hydraulic calculations as being more demanding than the existing remote area.. Provide branchline restraints. Provide E.Q. bracing as discussed in the riser room. Provide upright sprinkler head in the entry canopy as discussed. Sprinkler piping in the restrooms is ok to cover and the general installation of the overhead lines is passed.
|
FIR13-00623
| INSP-Final Inspection | 11/8/2013 | 11/12/2013 | 11/12/2013 10:12:00 AM | A | PASS |
|
|
Permit finaled
|
BLD13-03002
| FIRE-Final Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 10:03:18 AM | P | PASS |
|
|
Life safety passed
|
FIR13-00386
| INSP-Final Inspection | 11/11/2013 | 11/12/2013 | 11/12/2013 9:34:31 AM | A | PASS |
|
|
Permit finaled
|
FIR13-00360
| INSP-Final Inspection | 11/7/2013 | 11/12/2013 | 11/12/2013 9:33:04 AM | A | PASS |
|
|
Permit finaled. Jason to provide as-builts to lee showing the change from 15cd to 30cd in the Copy area.
|
BLD13-02961
| FIRE-Final Inspection | 11/6/2013 | 11/12/2013 | 11/12/2013 9:01:17 AM | A | PASS |
|
|
Life safety passed. Owner to repair or remove the emergency light
|