ESC13-01079
| Site Final | 11/12/2013 | 11/12/2013 | 11/12/2013 4:58:57 PM | P | NR |
|
|
Cutting Edge tree hole project; check that work is completed as stated by RP.
Some sweeping is around tree hole area is in progress. Will follow up tomorrow to make sure it is complete.
|
ESC12-00628
| Aging Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 4:57:32 PM | | PASS |
|
|
This phase is complete and stabilized. No further ESC inspections required for this permit. Ongoing construction in other phases of Pine Tree Village.
|
ESC12-00628
| DOC - Permit Finaled | 11/12/2013 | 11/12/2013 | 11/12/2013 4:54:21 PM | P | PASS |
|
|
|
ESC12-00629
| Aging Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 4:51:50 PM | | PASS |
|
|
Building complete and stabilized
|
ESC12-00629
| DOC - Permit Finaled | 11/12/2013 | 11/12/2013 | 11/12/2013 4:51:10 PM | P | PASS |
|
|
|
ESC13-00492
| General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 4:39:48 PM | | PART |
|
|
Site BMPs installed but still considerable track out onto Smoke Ranch. Contracted with PCS but trucks are currently out of service; parking lots are scheduled to be paved either next Mon/Tues (11/19) so should solve track out problem. New DI filter bags have been installed.
|
ESC12-01148
| Aging Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 4:14:04 PM | | PASS |
|
|
No construction activity. House is half complete, project appears to be on hold. No ESC violations observed. BLD permit expires 1/7/2014
|
ESC13-01053
| Site Preparation | 11/12/2013 | 11/12/2013 | 11/12/2013 3:43:59 PM | P | PASS |
|
|
John Phone #: ###-####
Site is approved for construction. RP Jon will have class 11/21. Low risk site; no corrections at this time.
|
ESC13-00014
| General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 3:24:45 PM | | PASS |
|
|
Finaled. See activity notes
|
ESC13-00014
| DOC - Permit Finaled | 11/12/2013 | 11/12/2013 | 11/12/2013 3:24:15 PM | P | PASS |
|
|
Project complete and stabilized. Project related permits finaled. No further ESC inspections required.
|
ESC12-01216
| General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 3:13:19 PM | | PART |
|
|
Jack in the Box is open for business and has a temporary C of O. The adjacent dirt lot is graded but there is no activity. The lot needs stabilization or restricted access to prevent track out to parking lot and street. See activity notes
|
ESC13-01079
| Site Preparation | 11/12/2013 | 11/12/2013 | 11/12/2013 1:53:58 PM | P | CANC |
|
|
data entry error. Site final was requested
|
ESC13-00835
| BMP Violation | 11/12/2013 | 11/12/2013 | 11/12/2013 11:04:34 AM | A | PART |
|
|
Follow-up inspection- Corrections made:
1. Wattles installed per ESCP 2. DI bag was replaced and new bag installed 3. Gravel bag check dams placed in gutter
Deficiences: 1. No trash container provided 2. Foundation is poured but no wash out provided. Improper washout in next lot is not maintained and does not have construction entrance and will cause more track out..
New corrections: 1. Clean up/remove cement washout; or provide adequate BMPs for use.
|
ESC13-00193
| General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 10:47:54 AM | | PASS |
|
|
Installing stormwater structures on culdesac at time of inspection. Silt fence is installed along back slope and is containing stockpile. Construction entrance is in use. Some minor track out observed, but can be sweeped at end of day. No corrections at this time.
|
ESC13-00114
| General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 10:16:10 AM | | PASS |
|
|
No corrections at this time. Townhome is complete and landscaped. BLD permit is still open. House does not have address up yet.
|
ESC09-00352
| General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 9:51:04 AM | | PASS |
|
|
No construction activity. Park is now managed by Boise Parks and Rec. BLD permit for grading was finaled in 2012. Will check with Brighton Corp to check if any further work is planned; BMPs still installed. No corrections at this time.
|
ESC13-01090
| Site Preparation | 11/12/2013 | 11/12/2013 | 11/12/2013 9:30:53 AM | P | PASS |
|
|
John Phone #: ###-####
Site BMPs are installed including construction entrance, conccarete washout; and DI protection on Barber Drive. Approved.
|
ESC13-00636
| Site Preparation | 11/12/2013 | 11/12/2013 | 11/12/2013 9:15:12 AM | P | PASS |
|
|
Clint Phone #: ###-####
Site located between two existing homes. Tahoe Homes has designated washouts for use; DI have filter bags. Permit posted. Approved for construction.
|
ESC13-01065
| Site Preparation | 11/11/2013 | 11/12/2013 | 11/12/2013 9:02:06 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by brandon waltman;
Wattles protecting downslope to alley; limited space since is townhouse. Permit is posted. Met RP Braxton onsite to discuss Mill Square BMPs. Site is ready for excavation. Cement washout is located on Woodcraft
|
ESC13-01064
| Site Preparation | 11/11/2013 | 11/12/2013 | 11/12/2013 9:01:14 AM | A | PASS |
|
|
Please inspect as early as possible. thanks, Braxton Phone #: ###-#### >> Inspection requested via web by brandon waltman;
Wattles protecting downslope to alley; limited space since is townhouse. Permit is posted. Met RP Braxton onsite to discuss Mill Square BMPs. Site is ready for excavation. Cement washout is located on Woodcraft
|