Inspections for the day of: Wednesday, November 12, 2014.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-01765 BLD-Energy code compliance11/12/201411/12/201411/12/2014 4:07:22 PMPPASS
BLD14-01479 BLD-Wall Bracing11/12/201411/12/201411/12/2014 3:33:23 PMPPASS
Firewall shear Phone #: ###-#### Inspection requested via web by Brian Stark. interior shear walls ok.
BLD13-03525 BLD-Final11/12/201411/12/201411/12/2014 3:32:40 PMPPASS
Please call brian Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03525 DOC - Permit Finaled11/12/201411/12/201411/12/2014 3:32:29 PMPPASS
BLD14-00205 BLD-Final11/10/201411/12/201411/12/2014 3:01:41 PMPFAIL
Tyler Phone #: ###-####. Firestop penetrations in riser room and provide handrails at exterior landing.
BLD14-00204 BLD-Final11/10/201411/12/201411/12/2014 3:00:43 PMPFAIL
Tyler Phone #: ###-####. provide the rquired 5/8 type x sheet rock in fire riser room and firestop all penetrations.
BLD14-00207 BLD-Framing/Rough-in11/12/201411/12/201411/12/2014 2:59:28 PMPPASS
tYLER Phone #: ###-####
BLD14-02036 BLD-Framing/Rough-in11/12/201411/12/201411/12/2014 2:04:01 PMPPASS
Kirt Phone #: ###-####
BLD14-02162 BLD-Final11/10/201411/12/201411/12/2014 1:51:17 PMPPART
John Hyne Phone #: ###-####(please make notes if not need electrical, plumbing and mechanical to sign off on temp). ok for temp occ. during ti work.
BLD14-02350 BLD-Foundation11/12/201411/12/201411/12/2014 1:37:51 PMPPASS
Jim-rebar Phone #: ###-####. Concrete tilt panels 1 to 18 and 22 to32.
BLD14-02095 BLD-Conference11/10/201411/12/201411/12/2014 11:52:29 AMACANC
keith Phone #: ###-####
BLD14-01765 BLD-Energy code compliance11/10/201411/12/201411/12/2014 11:03:35 AMANR
pat Phone #: ###-####
BLD14-01481 BLD-Energy code compliance11/11/201411/12/201411/12/2014 10:13:55 AMAPASS
Call brian please Phone #: ###-#### Inspection requested via web by Brian Stark
BLD14-03020 BLD-Final11/10/201411/12/201411/12/2014 9:45:02 AMADONE
Emmett Phone #: ###-####-call for access
BLD14-03020 DOC - Permit Finaled11/12/201411/12/201411/12/2014 9:44:53 AMPPASS
Final for a unconditioned sun room. Noted that the majority of this project was built prior to obtaining building permits. Foundation system was not inspected by boise city, therfore can not be verified at this time.
BLD14-03084 BLD-Framing/Rough-in11/10/201411/12/201411/12/2014 9:21:06 AMAPASS
eric Phone #: ###-####
BLD14-03027 BLD-Footing11/10/201411/12/201411/12/2014 8:56:03 AMAPASS
Jeff Phone #: ###-####