Inspections for the day of: Thursday, November 12, 2015.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS15-00285 FIR-Conference11/12/201511/12/201511/16/2015 1:44:43 PMPDONE
I had not heard back from Tim with KellerWilliams or from a contractor so I stopped and gave Tim an offical notice to get a permit for the construction of the new office. I emailed Bob as well.
BLD15-03436 FIRE-Final Inspection11/12/201511/12/201511/12/2015 1:50:40 PMPPASS
life safety passed
FIR15-00754 INSP-Final Inspection11/12/201511/12/201511/12/2015 1:49:58 PMPPASS
Permit finaled
FIR15-00582 INSP-Final Inspection11/12/201511/12/201511/12/2015 1:26:21 PMPPASS
Permit finaled
BLD15-03858 FIRE-Final Inspection11/12/201511/12/201511/12/2015 12:01:40 PMPPASS
Life safety passed
BLD15-03742 FIRE-Final Inspection11/12/201511/12/201511/12/2015 12:00:13 PMPPART
StarBucks area life safety passed
BLD15-01983 FIRE-Final Inspection11/12/201511/12/201511/12/2015 11:27:10 AMPPASS
life safety passed
FIR15-00725 INSP-Final Inspection11/11/201511/12/201511/12/2015 11:24:36 AMAPASS
Permit finaled
BLD15-03878 FIRE-Final Inspection11/12/201511/12/201511/12/2015 11:14:57 AMAFAIL
No city approved plans on site and sprinkler pendants need modified for the new wall arrangement.
FIR15-00719 INSP-Sprinkler Rough-in11/10/201511/12/201511/12/2015 9:51:47 AMAPASS
Rough-in passed. Tenting passed. Piping can be covered.
FIR15-00661 INSP-Sprinkler Rough-in11/10/201511/12/201511/12/2015 9:51:15 AMAPASS
Rough-in passed. Tenting passed. Piping can be covered.