ESC15-00948
| Site Final | 11/12/2015 | 11/12/2015 | 11/12/2015 5:02:46 PM | P | PASS |
|
|
Eric w/ Lurre ###-####
Area of construction was swept and most loose dirt was moved. Some residual mud stains are on the asphalt but will drain to new private system involved. ESC permit conditions satisifed. No discharges from site, no disturbed area.
|
ESC15-00656
| DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 4:10:44 PM | P | PASS |
|
|
|
ESC14-01083
| General Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 4:03:06 PM | | PART |
|
|
No trackout or discharges offsite. Site perimeter fence is containing windblown litter and controlling access. All stormdrains and sediment bag inlets installed.
Correction: - house keeping around site should improve. Trash containers are provided but there is lots of litter around townhomes and in the gutter. Significant amounts of stucco material and washout in gutter and street as well as sawdust, both are potential polluntants when mixed with stormwater and drain the stormwater system. Site needs regular broom sweeping to control accumulations.
Will also discuss with Brighton Homes RP
|
ESC15-01223
| Site Preparation | 11/12/2015 | 11/12/2015 | 11/12/2015 3:53:55 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign is posted at site. Subdivision BMPs installed and workers gaining access to site via alley and staying off landscaping.
BMPs include lined concrete washout with sign, DI sediment bag protection, and straw wattles have been installed at the base of both Tahoe blocks on both sides of Brookridge.
No violations observed. Approved for excavation.
|
ESC15-01056
| Site Preparation | 11/12/2015 | 11/12/2015 | 11/12/2015 3:53:42 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign is posted at site. Subdivision BMPs installed and workers gaining access to site via alley and staying off landscaping.
BMPs include lined concrete washout with sign, DI sediment bag protection, and straw wattles have been installed at the base of both Tahoe blocks on both sides of Brookridge.
No violations observed. Approved for excavation.
|
ESC15-00210
| General Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 3:27:20 PM | | CANC |
|
|
|
ESC14-01040
| General Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 2:57:06 PM | P | PASS |
|
|
Breckenwood sub is near completion with all vertical construction of the 9 4-plexs complete with associated ESC permits finaled.
No trackout or discharges, many units already occupied by tennants. DI bag still installed on Shellie while carport construction and final landscaping & sweep up is completed.
No corrections issued at this time.
|
ESC15-00463
| General Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 2:54:18 PM | | CANC |
|
|
|
ESC15-00388
| DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 2:52:48 PM | P | PASS |
|
|
4-plex building construction complete and parking lot area has been swept and waste material removed.
Carports and open space landscaping in progress is covered under Breckenwood main permit ESC14-01040. This permit finaled.
|
ESC15-00385
| DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 2:52:24 PM | P | PASS |
|
|
4-plex building construction complete and parking lot area has been swept and waste material removed.
Carports and open space landscaping in progress is covered under Breckenwood main permit ESC14-01040. This permit finaled.
|
ESC15-00384
| DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 2:51:43 PM | P | PASS |
|
|
4-plex building construction complete and parking lot area has been swept and waste material removed.
Carports and open space landscaping in progress is covered under Breckenwood main permit ESC14-01040. This permit finaled.
|
ESC15-00379
| DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 2:51:05 PM | P | PASS |
|
|
4-plex building construction complete and parking lot area has been swept and waste material removed.
Carports and open space landscaping in progress is covered under Breckenwood main permit ESC14-01040. This permit finaled.
|
ESC15-00380
| General Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 2:50:00 PM | | PASS |
|
|
4-plex building construction complete and parking lot area has been swept and waste material removed.
Carports and open space landscaping covered under Breckenwood main permit ESC14-01040. This permit finaled.
|
ESC15-00380
| DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 2:48:17 PM | P | PASS |
|
|
|
ESC15-00509
| Tracking Control | 11/12/2015 | 11/12/2015 | 11/12/2015 2:26:20 PM | P | PART |
|
|
Trackout from shared driveway.
Request to sweep up existing trackout and have workers park on culdsac to prevent trackout from their vehicles.
No other violations, work remaining within clearing limits and rear silt fence is installed.
Adjacent project is to have their portion of driveway paved next week.
|
ESC15-01246
| Site Preparation | 11/12/2015 | 11/12/2015 | 11/12/2015 1:47:47 PM | P | PASS |
|
|
Brett Phone #: ###-####
Yellow permit sign posted. DI bag installed on inlet in front of house. Active CBH projects in Peppermill Estates are in compliance. Approved for excavation.
|
ESC15-00354
| Aging Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 1:39:55 PM | | PASS |
|
|
WIP on Gatewood duplexes, no trackout or sediment runoff from site. Trash contained, no complaints received. Permit sign posted.
|
ESC15-00353
| Aging Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 1:39:40 PM | | PASS |
|
|
WIP on Gatewood duplexes, no trackout or sediment runoff from site. Trash contained, no complaints received. Permit sign posted.
|
ESC15-00352
| Aging Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 1:39:27 PM | | PASS |
|
|
WIP on Gatewood duplexes, no trackout or sediment runoff from site. Trash contained, no complaints received. Permit sign posted.
|
ESC15-01443
| Site Final | 11/12/2015 | 11/12/2015 | 11/12/2015 1:29:30 PM | P | PASS |
|
|
Cody ###-####
Area of excavation has been paved over/stabilized. No loose sediment or temporary BMPs left on site. Permit finaled.
|
ESC14-00403
| Site Final | 11/12/2015 | 11/12/2015 | 11/12/2015 12:08:26 PM | P | PASS |
|
|
BLD for home is finaled and it is now occupied. Yard landscaped and driveway is complete. Warm Springs Ave bikelane and sidewalk are free of loose sediment.
Pool house and pool structures covered under ESC15-00417.
|
ESC15-00396
| DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 12:05:13 PM | P | PASS |
|
|
|
ESC15-01362
| Site Preparation | 11/12/2015 | 11/12/2015 | 11/12/2015 11:44:55 AM | P | PASS |
|
|
Brain Phone #: ###-####
Permit sign posted, perimeter silt fence installed. RP familiar with BMPs and permit conditions, current Lasher project in Boulder Heights in compliance. Approved for excavation.
|
ESC15-01188
| General Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 11:27:23 AM | A | PART |
|
|
Permit sign posted, site materials staying on site and no windblown litter.
Corrections: - sweep sandy material on driveway apron and parts of culdsace. Install sediment control sandbag tube in gutter to capture/treat runoff - install perimeter silt fence or wattle below excavated area
No erosion issues, but discussed correction with RP which will occur next week when site becomes active again.
|
ESC14-00135
| General Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 11:16:03 AM | | PEND |
|
|
Slope to right of home still not stabilized, temporary wattle is installed, hydroseeding does not appear to have yet established, however no sediment runoff occuring to culdesac.
|
ESC13-00755
| General Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 11:01:30 AM | | PASS |
|
|
Terraces project is near completion with plans to be done in December. Staging area is still in use, no trackout from entrance. East entrance off Lysted is now paved and landscaped and SWPPP information posted clearly. No discharges or trackout. No corrections at this time, no DI bags have been removed yet from site, RP stated they will all be pulled at once after final stabilization of all disturbed areas and removal of materials.
|
ESC15-00984
| Tracking Control | 11/12/2015 | 11/12/2015 | 11/12/2015 10:37:19 AM | P | PART |
|
|
Landscapers made mess in street on Brundage. Need to return to site and remove mud.
Home is near completion and Hayden Homes RP stated road will be swept tomorrow or Saturday before next forecast rainfall.
|
ESC15-00822
| Tracking Control | 11/10/2015 | 11/12/2015 | 11/12/2015 10:33:33 AM | A | PASS |
|
|
WIP on paving parking lot today and tomorrow the Shosone and Sunrise Rim utility trenches will be asphalted.
DI bags on existing storm drains are installed and in good condition. Reqeusted that some mud near landscaping area (NE corner by Applebees) be cleaned and RP agreeed to send crew there today. No discharges or spills, next week will all hard surfaces installed there will be significantly less of a trackout problem.
Will continue to monitor.
|
ESC14-00206
| General Inspection | 11/10/2015 | 11/12/2015 | 11/12/2015 10:23:14 AM | A | PART |
|
|
Significant trackout occuring on Brundage Ave due to active landscaping. Muddy conditions are making it difficult. Hayden Homes and Eaglewood Homes will have developer order street sweeper.
No spills or areas of sediment runoff from open parcels observed.
Employees parking on paved surfaces, all storm drain inlets have sediment bags installed, and a designated lined washout is being utilized and has remaining capacity. Soon road/sidewalk medians will be landscaped stabilized so trackout will be less of problem. Trash and materials are contained at sites.
|