ELE17-03670
| ELE-Aging Inspection | 11/12/2019 | 11/12/2019 | 11/15/2019 12:44:31 PM | | PASS |
|
|
Called office who said they would pass on info to shop.
|
ELE17-03806
| ELE-Aging Inspection | 11/12/2019 | 11/12/2019 | 11/15/2019 12:39:02 PM | | PASS |
|
|
Contacted Jason, he said he would contact owner of house and schedule final.
|
ELE15-00102
| DOC - Permit Expired | 11/12/2019 | 11/12/2019 | 11/12/2019 3:59:56 PM | P | PASS |
|
|
Doc expired ok
|
ELE19-04278
| Final | 11/12/2019 | 11/12/2019 | 11/12/2019 3:52:36 PM | P | PASS |
|
|
Home Owner Stated All Issues On Work By Others Resolved I Will Have My Corrections Resolved And Finished Thanks For Your Help Phone #: ###-#### Inspection requested via web by jason shifflett Confirmed with building inspector other permitting issues being handled. Final ok
|
ELE19-04379
| Permanent Service | 11/12/2019 | 11/12/2019 | 11/12/2019 3:34:16 PM | P | FAIL |
|
|
Call for access- Roy Phone #: ###-#### Too many violations to list, 200 main breaker panel installed where a 125 amp main breaker panel had failed. 125 amp mete base not changed, mast left original, Deck built around old existing meter base. Explained reason for conference, owner understood but decided to for go to save time.
|
ELE19-04379
| Conference | 11/12/2019 | 11/12/2019 | 11/12/2019 3:34:07 PM | P | DONE |
|
|
Call for access- Roy Phone #: ###-#### Discussed minimums required for change out of interior main breaker panel, Work space shall be provided for meter base and interior panel, 2" IMC minimum shall be installed for service mast used to support power swing. 2/0 copper conductors or 4/0 aluminum minimum shall be installed for service entrance conductors, Unable to verify metal underground water pipe so minimum of 2 ground rods shall be installed with #6 copper grounding electode conductor. Main bonding jumper screw shall be installed. Discussed bonding issuew with metal nipple verses non-metallic. Discussed minimum support required for service mast. Discussed other issues found in mechanical/ utility room, Dryer branch circuit shall terminate in a box as per 300.15 and basement range shall have sheathing installed in box at least 1/4". Seperate traveller ran on exterior of other NM cable in 3-way switch, red conductor. Must fix these issues by final.
|
ELE19-04338
| Electrical Rough-In | 11/12/2019 | 11/12/2019 | 11/12/2019 2:08:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Due to shortage of materials all recessed luminaires to be listed cut-in type cans. Soffits and hardlids rough in ok cover
|
ELE19-02436
| Final | 11/10/2019 | 11/12/2019 | 11/12/2019 1:01:10 PM | A | PASS |
|
|
Back door will be unlocked for entry Phone #: ###-#### Inspection requested via web by Tyler Ridley All areas finishes not complete but electrical all safe. Final ok
|
ELE19-04341
| Conference | 11/8/2019 | 11/12/2019 | 11/12/2019 12:21:31 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gary Betts Owner is an electrical engineer, good understanding of scope of work. Discussed type of receptacles required, TR, WR, GFCI, flappers ok under cover, single circuit no grounding electrode required, shall be sch.80 where emerge from grade under meter main, NM cable ok in cabinet where protected form moisture. Trench to be 90% under pavers, depth ok
|
ELE19-04242
| Rough-In Permanent Service | 11/8/2019 | 11/12/2019 | 11/12/2019 11:16:08 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt Rough in ok cover p/s u/g n ok
|
ELE19-04294
| Temporary Service | 11/8/2019 | 11/12/2019 | 11/12/2019 11:04:46 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn 250.68(B)- Connection to grounding electrode shall be tight to provide an effective ground path. Acorn on transformer post loose.
|
ELE19-04177
| Temporary Service | 11/11/2019 | 11/12/2019 | 11/12/2019 10:47:19 AM | A | PASS |
|
|
Corbin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Service to be reconnected on a temporary basis due to transformer and meter base will have to move when road widening project begins. t/s u/g rec ok
|
ELE19-00602
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 10:00:41 AM | A | PASS |
|
|
SE Stair tower in garage. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Stairway noted pour rough in ok cover
|
ELE19-00601
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 9:59:58 AM | A | PASS |
|
|
3rd Floor hotel room cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Level 3 rooms 302 thru 324 rough in ok cover
|
ELE19-04338
| Electrical Rough-In | 11/8/2019 | 11/12/2019 | 11/12/2019 9:10:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Walls only rough in ok cover
|
ELE19-03235
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 8:48:29 AM | A | NR |
|
|
Electrical Rough in for walls. Phone #: ###-#### Inspection requested via web by Deb Ipsen Unable to inspect until a building permit has been issued for work taking place.
|
ELE19-03585
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 8:41:19 AM | A | PASS |
|
|
Bathroom ceiling Phone #: ###-#### Inspection requested via web by Jim Williams No changes to bathroom walls. Both bathroom walls and ceilings rough in ok cover
|