ELE19-04319
| Electrical Rough-In | 11/8/2019 | 11/12/2019 | 11/12/2019 3:10:28 PM | P | PASS |
|
|
Please call me 30 minutes before arrival so that tenant can open the door for you, thank you Phone #: ###-#### Inspection requested via web by Keith Chetta Receps along sink wall Rough in ok
|
ELE19-04360
| Final | 11/12/2019 | 11/12/2019 | 11/12/2019 2:12:48 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wake final ok
|
ELE19-04300
| Temporary Service | 11/8/2019 | 11/12/2019 | 11/12/2019 1:47:14 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|
ELE19-04342
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 12:55:17 PM | P | PASS |
|
|
Please contact when in route as no one will be on site Phone #: ###-#### Inspection requested via web by Cortney Hopper Sun room only ok to cover
|
ELE19-04343
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 12:17:38 PM | A | PASS |
|
|
Electrical Rough-in (Kitchen Remodel) Please call Dan ###-#### and he will meet you on site. Phone #: ###-#### Inspection requested via web by Kendra Lanham Kitchen only ok to cover
|
ELE19-03691
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 12:03:01 PM | A | PASS |
|
|
Please all half an hour before inspection to insure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Floor heat only ok to cover
|
ELE19-02909
| Final | 11/10/2019 | 11/12/2019 | 11/12/2019 11:37:25 AM | A | PASS |
|
|
Inspection requested via web by ERIC CENTERS Painters had removed plates but had left them in the vicinity of the divice. Final ok
|
ELE19-04111
| Rough-In Permanent Service | 11/11/2019 | 11/12/2019 | 11/12/2019 11:24:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn rough in ok p/s u/g n ok
|
ELE19-03991
| Rough-In Permanent Service | 11/11/2019 | 11/12/2019 | 11/12/2019 10:49:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk rough in ok p/s u/g n ok
|
ELE19-04178
| Permanent Service | 11/11/2019 | 11/12/2019 | 11/12/2019 10:23:22 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Philip Dixon Needed final
|
ELE19-04178
| Final | 11/12/2019 | 11/12/2019 | 11/12/2019 10:23:09 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Philip Dixon 250.52A5 Ground rod shall be 8ft and driven flush with ground(rod has been bent over 24in above ground.) 250.64E1. Grounding electrode installed in ferrous raceways. Raceway shall be bonded at both ends.(EMT sleeve over conductor)
|
ELE19-03700
| Final | 11/8/2019 | 11/12/2019 | 11/12/2019 9:53:14 AM | A | PASS |
|
|
Has already been inspected, just needed to request another final to close it out. James is aware of the situation, thank you Phone #: ###-#### Inspection requested via web by Keith Chetta Hot tub has been finish under seperate permit. Final ok
|
ELE19-01482
| Electrical Rough-In | 11/8/2019 | 11/12/2019 | 11/12/2019 9:39:58 AM | A | PASS |
|
|
Front parking lot underground inspection please Phone #: ###-#### Inspection requested via web by Angela Stears Builder is bringing grade up and assures ther will be 24in above all conduits. Underground to car port ok to cover
|
ELE19-04132
| Final | 11/8/2019 | 11/12/2019 | 11/12/2019 9:16:39 AM | A | PASS |
|
|
Colin LaFramboise is the on site contact Phone #: ###-#### Inspection requested via web by BRS Permitting Final ok
|
ELE19-04243
| Rough-In Permanent Service | 11/8/2019 | 11/12/2019 | 11/12/2019 8:57:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt rough in ok p/s u/g n ok
|
ELE19-01201
| Final | 11/11/2019 | 11/12/2019 | 11/12/2019 8:37:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Thomas wilson Final ok
|