ELE00-02915
| Final | 11/10/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 16:32:55. Contact: ###-####. completed. 11/13/2000 11:35:33 AM
|
ELE00-04361
| Electrical Rough-In | 11/13/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | A | PASS |
|
|
this permit is only for two rooms are they doing any more stuff?\\###-#### or ###-####. pvc in underground/trench to outbuilding. 11/13/2000 9:01:31 PM
|
ELE00-02929
| Electrical Rough-In | 11/9/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | A | PASS |
|
|
Martin ###-#### service to the duplex coming underground from the existing power to the house. Trench w/conduit. Depth. pvc conduit groundwork. 11/13/2000 11:36:56 AM 11/13/2000 11:37:01 AM 11/13/2000 11:37:31 AM
|
ELE00-00216
| Final | 11/9/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | A | PASS |
|
|
###-####. completed. 11/13/2000 11:36:14 AM
|
ELE00-00669
| Electrical Rough-In | 11/10/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 08:54:05. Contact: ###-####. 4th floor, ceiling ele r/i ; corridor and apartments. 11/13/2000 9:04:15 PM
|
ELE00-04305
| Electrical Rough-In | 11/13/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | P | PART |
|
|
2nd floor\\###-####. northend area, walls ele r/i. 11/13/2000 9:02:32 PM
|
ELE00-04367
| Electrical Rough-In | 11/13/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | P | PASS |
|
|
R/I ###-####- TANYA . laundry-closet ele r/i. 11/13/2000 9:10:49 PM
|
ELE98-02031
| Permanent Service | 11/13/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | P | PASS |
|
|
outside weather mast\\###-#### Renie. meter/main panel installation; new location at east end of building. 11/13/2000 9:10:04 PM
|
ELE00-04372
| Final | 11/13/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | P | PASS |
|
|
BRENDA ###-#### A/C unit; compressor. 11/13/2000 9:11:44 PM
|
ELE00-04357
| Electrical Rough-In | 11/13/2000 | 11/13/2000 | 11/13/2000 12:00:00 AM | P | PART |
|
|
###-####. 1st floor ele r/i; walls. corrections posted for low-voltage conduit installation; supports, and bends. installed by other contractor. 11/13/2000 9:07:49 PM
|