BLD01-01930
| BLD-Aging Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | | NR |
|
|
outbldg...homeowner job; wip. 11/13/2001 9:45:36 AM
|
BLD01-01635
| BLD-Framing/Rough-in | 11/12/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 14:46:33. Contact: ###-####....ext nailing: nail fields at unit 1, rest ok. need to maintain drainage away from bldg. & earth/woodseparation. 11/13/2001 10:33:52 AM
|
BLD01-02393
| BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 340 On 11/13/2001 11:16:10 AM complete nailing at edges of shear...show panels below paper & plans. told bldr to recall when ready.
|
BLD01-00594
| BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 11/13/2001 11:05:00 AM ok to cover walls; still need flood plain cert ( has at office?)
|
BLD01-01643
| BLD-Conference | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 11/13/2001 9:16:37 AM w/ supt. re ceiling req's.
|
MEC01-03330
| Final | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/13/2001 at 09:54:14. Contact: ###-####.
|
MEC01-01660
| Conference | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/13/2001 at 09:54:31. Contact: ###-####. w/ owner ...need complete venting...BW vents ok per listing w/ spacers. 11/13/2001 3:28:45 PM 11/13/2001 3:46:58 PM
|
BLD01-01643
| BLD-Foundation | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | NR |
|
|
###-#### rick
|
BLD01-00172
| BLD-Conference | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/13/2001 at 09:59:41. Contact: ###-####...re in wall furnace, fireblox; complete work, recall. ok to cut tji at brg wall by stair 11/13/2001 3:48:07 PM
|
MEC01-03410
| Pressure Test | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PASS |
|
|
pres test--jerry-- ###-####...25# ok 11/13/2001 5:15:48 PM
|
BLD01-01671
| BLD-Final | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | FAIL |
|
|
###-#### TONY , c/n, clarify 1hr door & wall req's...ok for t/o. 11/13/2001 4:26:43 PM
|
BLD01-01790
| BLD-Final | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PASS |
|
|
Don, ###-####
|
BLD01-01643
| BLD-Conference | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 11/13/2001 12:23:43 PM w/ framer & bldr re exit signs & clg reqs
|
BLD01-02193
| BLD-Conference | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 11/13/2001 12:24:53 PM w/ bldr re clg ht, need headroom at stairs, will advise re duct, pipe
|
BLD01-01993
| BLD-Conference | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 11/13/2001 12:25:47 PM w/ bldr & arch onsite re exit reqs
|
BLD01-00000
| BLD-Framing/Rough-in | 11/12/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 17:17:27. Contact: ###-####.
|
BLD00-01649
| BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | NR |
|
|
###-#### MEL 11/13/2001 1:50:21 PM 11/13/2001 1:50:49 PM
|
BLD01-00594
| BLD-Wall cover | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/13/2001 at 08:24:42. Contact: ###-####. ok to cover, need int gyp shear nail insp & flood certs; chk stairs/rails at final . .11/13/2001 1:50:02 PM 11/13/2001 1:51:35 PM
|