Inspections for the day of: Tuesday, November 13, 2001.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01930 BLD-Aging Inspection11/13/200111/13/200111/13/2001 12:00:00 AM NR
outbldg...homeowner job; wip. 11/13/2001 9:45:36 AM
BLD01-01635 BLD-Framing/Rough-in11/12/200111/13/200111/13/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/12/2001 at 14:46:33. Contact: ###-####....ext nailing: nail fields at unit 1, rest ok. need to maintain drainage away from bldg. & earth/woodseparation. 11/13/2001 10:33:52 AM
BLD01-02393 BLD-Framing/Rough-in11/13/200111/13/200111/13/2001 12:00:00 AMAFAIL
Added by Inspector: 340 On 11/13/2001 11:16:10 AM complete nailing at edges of shear...show panels below paper & plans. told bldr to recall when ready.
BLD01-00594 BLD-Framing/Rough-in11/13/200111/13/200111/13/2001 12:00:00 AMAPART
Added by Inspector: 340 On 11/13/2001 11:05:00 AM ok to cover walls; still need flood plain cert ( has at office?)
BLD01-01643 BLD-Conference11/13/200111/13/200111/13/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 11/13/2001 9:16:37 AM w/ supt. re ceiling req's.
MEC01-03330 Final11/13/200111/13/200111/13/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/13/2001 at 09:54:14. Contact: ###-####.
MEC01-01660 Conference11/13/200111/13/200111/13/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/13/2001 at 09:54:31. Contact: ###-####. w/ owner ...need complete venting...BW vents ok per listing w/ spacers. 11/13/2001 3:28:45 PM 11/13/2001 3:46:58 PM
BLD01-01643 BLD-Foundation11/13/200111/13/200111/13/2001 12:00:00 AMPNR
###-#### rick
BLD01-00172 BLD-Conference11/13/200111/13/200111/13/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/13/2001 at 09:59:41. Contact: ###-####...re in wall furnace, fireblox; complete work, recall. ok to cut tji at brg wall by stair 11/13/2001 3:48:07 PM
MEC01-03410 Pressure Test11/13/200111/13/200111/13/2001 12:00:00 AMPPASS
pres test--jerry-- ###-####...25# ok 11/13/2001 5:15:48 PM
BLD01-01671 BLD-Final11/13/200111/13/200111/13/2001 12:00:00 AMPFAIL
###-#### TONY , c/n, clarify 1hr door & wall req's...ok for t/o. 11/13/2001 4:26:43 PM
BLD01-01790 BLD-Final11/13/200111/13/200111/13/2001 12:00:00 AMPPASS
Don, ###-####
BLD01-01643 BLD-Conference11/13/200111/13/200111/13/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 11/13/2001 12:23:43 PM w/ framer & bldr re exit signs & clg reqs
BLD01-02193 BLD-Conference11/13/200111/13/200111/13/2001 12:00:00 AMPPART
Added by Inspector: 340 On 11/13/2001 12:24:53 PM w/ bldr re clg ht, need headroom at stairs, will advise re duct, pipe
BLD01-01993 BLD-Conference11/13/200111/13/200111/13/2001 12:00:00 AMPPART
Added by Inspector: 340 On 11/13/2001 12:25:47 PM w/ bldr & arch onsite re exit reqs
BLD01-00000 BLD-Framing/Rough-in11/12/200111/13/200111/13/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 11/12/2001 at 17:17:27. Contact: ###-####.
BLD00-01649 BLD-Framing/Rough-in11/13/200111/13/200111/13/2001 12:00:00 AMPNR
###-#### MEL 11/13/2001 1:50:21 PM 11/13/2001 1:50:49 PM
BLD01-00594 BLD-Wall cover11/13/200111/13/200111/13/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 11/13/2001 at 08:24:42. Contact: ###-####. ok to cover, need int gyp shear nail insp & flood certs; chk stairs/rails at final . .11/13/2001 1:50:02 PM 11/13/2001 1:51:35 PM