BLD01-02504
| BLD-Aging Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | | PART |
|
|
wip 11/13/2001 11:21:31 AM
|
BLD01-02164
| BLD-Aging Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | | PART |
|
|
wip 11/13/2001 11:21:42 AM
|
BLD01-01564
| BLD-Aging Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | | PART |
|
|
wip 11/13/2001 11:21:20 AM
|
BLD01-02215
| BLD-Aging Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | | PART |
|
|
wip? 11/13/2001 11:22:03 AM
|
BLD01-02214
| BLD-Aging Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | | PART |
|
|
wip 11/13/2001 11:21:53 AM
|
BLD01-02446
| BLD-Foundation | 11/9/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | PART |
|
|
###-#### SCOTT FOR THE UPPER PORTAIN
|
BLD01-01990
| BLD-Framing/Rough-in | 11/9/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | FAIL |
|
|
###-#### SHEILA
c/n posted, ok to insulate, need fp permit also 11/13/2001 11:15:45 AM
|
MEC01-03403
| Rough-in | 11/9/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | PART |
|
|
###-#### RANDY
c/n, ok to insulate, check at frame re-inspection 11/13/2001 11:16:43 AM
|
MEC01-03340
| Pressure Test | 11/12/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 10:02:30. Contact: ###-####.
|
BLD01-01315
| BLD-Framing/Rough-in | 11/12/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 16:27:51. Contact: ###-####.
need to have eng. verify as built on shear or give fixes 11/13/2001 12:25:30 PM
|
MEC01-03403
| Pressure Test | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 415 On 11/13/2001 11:12:22 AM
|
BLD01-00662
| BLD-Framing/Rough-in | 11/9/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PART |
|
|
###-#### JIM
c/n posted on inspection card, truss bracing and bearing on 2 ply 4 pt bearing, 2 other point loads,,, ok to insulate 11/13/2001 3:30:54 PM
|
BLD01-01014
| BLD-Energy code compliance | 11/12/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 09:18:16. Contact: ###-####.
|
BLD01-01056
| BLD-Final | 11/9/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/09/2001 at 15:46:53. Contact: ###-####.
need trades signed off, change lock out to no lock, label on fire door 11/13/2001 4:40:10 PM
|
BLD01-02804
| BLD-Foundation | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PART |
|
|
ELIZABETH ###-#### ###-#### STEM WALL
wip, ok 11/13/2001 3:47:52 PM
|
BLD01-01296
| BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | FAIL |
|
|
###-#### dale call first
need trades signed off, framing ok to cover after 11/13/2001 4:08:25 PM
|
BLD01-00021
| BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | FAIL |
|
|
brian-- cell ###-#### --call 1st before insp
c/n posted 11/14/2001 12:11:26 PM
|
BLD01-02756
| BLD-Foundation | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PART |
|
|
###-#### ROD
|
MIS01-00223
| BLD-Conference | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PASS |
|
|
Rehab request for housing code. Contact Brian or Janna @ ###-#### for access.
took paper work to mike hopkins house 11/14/2001 11:32:14 AM
|
BLD01-02670
| BLD-Foundation | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | PART |
|
|
###-#### tony wip 11/13/2001 1:53:42 PM
|
BLD01-02810
| BLD-Footing | 11/13/2001 | 11/13/2001 | 11/13/2001 12:00:00 AM | P | FAIL |
|
|
###-#### walt
no forms set up, no one on site 11/13/2001 1:41:07 PM
|