MEC02-02400
| Final | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 13:02:50. Contact: ###-####.
|
MEC02-02172
| Final | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | PASS |
|
|
###-#### shaun 1010 enter garage pad includes gas f.p. 11/13/02 4:26:11 PM
|
MEC02-03188
| Rough-in | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | PART |
|
|
out of time
|
MEC02-02472
| Final | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | FAIL |
|
|
out of time...Need post at gar...did this pass r/i? 11/13/02 11:20:53 AM
|
BLD02-02215
| BLD-Framing/Rough-in | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | PART |
|
|
need ext deck...ok to insul; looks good. 11/13/02 10:47:59 AM
|
BLD02-02744
| BLD-Footing | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | NH |
|
|
out of time...Called, unable to contact. 11/13/02 10:51:20 AM
|
BLD02-01997
| BLD-Wall cover | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | PASS |
|
|
out of time...insul ok, ok to cover pend all other trades. 11/13/02 3:00:33 PM
|
MEC02-03188
| Pressure Test | 11/13/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-00956
| BLD-Conference | 11/13/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | PASS |
|
|
left msg for owner
|
MEC02-02873
| Conference | 11/13/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | PART |
|
|
permit doesnt show fp.
|
BLD02-01997
| BLD-Energy code compliance | 11/13/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | PART |
|
|
walls ok
|
BLD02-02612
| BLD-Footing | 11/13/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | PART |
|
|
pour ftg only at own risk, still need eng'd ret wall
|
BLD02-01189
| BLD-Framing/Rough-in | 11/13/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/13/2002 at 10:14:00. Contact: ###-####.
|
MEC02-03240
| Final | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 15:56:34. Contact: ###-####.
|
MEC02-03240
| Pressure Test | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 15:56:52. Contact: ###-####...20lbs 11/13/02 3:38:34 PM
|
MEC02-03241
| Final | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 15:57:38. Contact: ###-####.
|
MEC02-03241
| Pressure Test | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 15:57:55. Contact: ###-####.
|