BLD02-01055
| FIRE-Final Inspection | 11/11/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | A | PASS |
|
|
life safety finaled 11/13/2002 1:17:50 PM
|
FIR02-00381
| INSP-Sprinkler Rough-in/Hydro | 11/12/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | PASS |
|
|
24 hour air test for the dry system is ok. It lost just over a pound of pressure 11/13/2002 1:17:21 PM
|
FIR02-00183
| INSP-Final Inspection | 11/7/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | PASS |
|
|
brad ###-####
|
FIR02-00287
| INSP-Final Inspection | 11/7/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | FAIL |
|
|
provide tamper switch on the gate valve on fire pump test line, verify weather proof pull station assembly, provide hi/low pressure switch for anechoic chamber dry pipe valve 11/14/2002 1:41:05 PM
|
FIR02-00286
| INSP-Final Inspection | 11/7/2002 | 11/13/2002 | 11/13/2002 12:00:00 AM | P | FAIL |
|
|
provide tamper switch on gate valve on fire pump test line, verify weather proof pull station assembly, provide hi/low pressure switch for anechoic chamber dry pipe valve 11/14/2002 1:42:18 PM
|