ELE06-03771
| Electrical Rough-In | 11/13/2006 | 11/13/2006 | 11/13/2006 12:30:48 PM | P | PASS |
|
|
jamie Note: ufier; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover with concrete and call back before covering with dirt.
|
ELE06-04212
| Final | 11/13/2006 | 11/13/2006 | 11/13/2006 12:30:11 PM | P | PART |
|
|
allen ###-#### conference, need door to hot tub open, and underground by disc. uncovered. JMS
|
ELE06-03957
| Rough-In Permanent Service | 11/13/2006 | 11/13/2006 | 11/13/2006 12:04:39 PM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Ryan Christensen was conference
|
ELE06-03015
| Rough-In Permanent Service | 11/10/2006 | 11/13/2006 | 11/13/2006 9:55:30 AM | A | PASS |
|
|
We are ready for the perm service and inspection of the new panel on the interior of the home behind the meter-panel. The home owner should be on site, if not please call Tanya @ ###-####. Thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH p/s o/h rec - ok jms
|