BLD08-01970
| FIRE-Final Inspection | 11/12/2008 | 11/13/2008 | 11/13/2008 6:21:52 PM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR08-00702
| INSP-Final Inspection | 11/12/2008 | 11/13/2008 | 11/13/2008 6:21:00 PM | A | PASS |
|
|
Fire sprinkler permit work passed final inspection.
|
BLD08-01970
| FIRE-Alarm Testing | 11/12/2008 | 11/13/2008 | 11/13/2008 6:18:52 PM | A | DONE |
|
|
don Phone #: ###-####
|
FIR08-00747
| INSP-Sprinkler Rough-in | 11/12/2008 | 11/13/2008 | 11/13/2008 12:54:22 PM | A | PART |
|
|
Overhead fire sprinkler system modifications at the tenant remodel area drop ceilings are approved for cover.
|
BLD08-02367
| FIRE-Final Inspection | 11/12/2008 | 11/13/2008 | 11/13/2008 12:52:09 PM | A | PASS |
|
|
Fire life safety inspection passed.
|
FIR07-01042
| INSP-Supply line flush | 11/12/2008 | 11/13/2008 | 11/13/2008 12:51:28 PM | A | NR |
|
|
Underground fire department connection pipe flush postponed until repairs are made.
|
FIR07-01042
| INSP-Sprinkler Rough-in/Hydro | 11/12/2008 | 11/13/2008 | 11/13/2008 12:49:38 PM | A | FAIL |
|
|
Hydrostatic testing for the remote FDC UG piping failed due to significant pressure loss at the guage.
|