ESC12-00931
| Conference | 11/8/2012 | 11/13/2012 | 11/13/2012 12:00:00 AM | P | DONE |
|
|
Discussed need to protect the permanent stormwater BMPs from construction activities with temporary BMPs.
|
ESC12-00977
| BMP Violation | 11/13/2012 | 11/13/2012 | 11/13/2012 12:00:00 AM | P | PART |
|
|
Perimeter control in but is not installed correctly and is not installed along limits of disturbance. Wattle must be trenched in and staked every 6 feet along property line. RP's mailbox full and couldn't not leave message. Will attempt to contact again 11/14
|