Inspections for the day of: Wednesday, November 13, 2013.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00250 General Inspection11/13/201311/13/201311/13/2013 4:39:38 PM PASS
Finaled.
ESC13-00250 DOC - Permit Finaled11/13/201311/13/201311/13/2013 4:39:15 PMPPASS
No further construction activity, project permits already finaled. Demolished building footprint is stabilized with pit run and river rock/gravel material. Not suitable for revegetation. No further ESC inspections required.
ESC13-01079 Site Final11/13/201311/13/201311/13/2013 4:34:02 PMPPASS
Tree hole soil has been installed and leveled. Surrounding sidewalks and streets well swept. Cutting Edge provided notification that they were finished with their scope of work. ESC permit conditions have been satisfied.
ESC13-01079 DOC - Permit Finaled11/13/201311/13/201311/13/2013 4:33:50 PMPPASS
Approved. See activity notes for site final inspection.
ESC12-01213 Aging Inspection11/13/201311/13/201311/13/2013 4:25:04 PM PASS
Some remaining interior work in progress. No ESC violations observed.
ESC11-00879 BMP Violation11/13/201311/13/201311/13/2013 4:14:16 PMPPASS
Follow up inspection/drive by. Noncompliant concrete washout at corner of Mesa Grande and Boise Hills has been removed. New washout pit not yet provided, will be placed next to road to prevent track out problems.
ESC13-00542 General Inspection11/13/201311/13/201311/13/2013 4:07:37 PM PASS
Wattle installed at foot of slope and sidewalk is installed properly and is effective. No corrections at this time
ESC13-00104 Aging Inspection11/13/201311/13/201311/13/2013 3:51:28 PM PASS
Finaled.
ESC13-00104 DOC - Permit Finaled11/13/201311/13/201311/13/2013 3:51:06 PMPPASS
House is complete and landscaped. BLD permit already finaled. ESC conditions satisfied, no further inspections necessary.
ESC13-00522 General Inspection11/13/201311/13/201311/13/2013 3:35:18 PM PASS
Wall is constructed as east end of Millet. No permanent or temporary stabilization yet, but hill behind wall is terraced. Approved. BLD permit is open.
ESC13-00501 General Inspection11/13/201311/13/201311/13/2013 3:16:07 PM PASS
Permit posted. Subdivision stormwater drop inlets protected with filter bag in good condition. Concrete washout in use. Perimeter wattles installed. Some minor track out may be due to larger development by Knife River.
ESC13-00561 General Inspection11/13/201311/13/201311/13/2013 2:24:28 PM PASS
BMPs implemented. No track out or other violations observed. Approved.
ESC13-00986 Random Inspection11/13/201311/13/201311/13/2013 2:04:43 PMPPASS
Follow up inspection conducted since was in same development.

Site conditions have improved. Minimal trackout, permit posted, and restricted acces to disturbed area. DI protection installed. Approved.
ESC12-00380 Aging Inspection11/13/201311/13/201311/13/2013 2:04:19 PM PASS
Exterior is complete, landscaped and stabilized. Interior work is not finished - no activity at time of inpsection. BLD12-00879 for townhouse is still open. No corrections at this time.
ESC13-01045 BMP Violation11/13/201311/13/201311/13/2013 1:30:51 PMPPASS
Follow up inspection to SWO issued previous week.

Corrections made:

1. Clean up non-compliant cement washout
2. Sweep street and sidewalks
3. Clean up trash/debris
4. Restrict access to adjacent lots to prevent trackout
5. ESC permit posted
6. Existing filter bag DI protection is satisfactory

Actions:
1. SWO and activity hold can be removed
2. Contractor/RP to pay reinspection fee
ESC12-00036 General Inspection11/13/201311/13/201311/13/2013 9:29:56 AM PASS
ESC13-01014 DOC - Permit Finaled11/13/201311/13/201311/13/2013 9:18:56 AMPPASS
see Site Final inspection notes.
ESC13-01014 Site Final11/12/201311/13/201311/13/2013 9:17:33 AMAPASS
ESC final requested by contractor contact Sam; site clean- up was started 11/12.

Project scope is complete and ESC conditions have been met. Site BMPs (wattle, construction entrance) will remain in place because next phase of project is out for bid and will begin soon. City of Boise contact is Wendy Larimore. Approved.
ESC13-01067 Site Preparation11/12/201311/13/201311/13/2013 9:01:39 AMAPASS
Travis Phone #: ###-####

Meeting and walk through with RP Travis. Permit is for townhouses in a larger common development.

1. Private stormwater drainage system is in process of installation, drop inlets will have filter bag protection.
2. Site features controlled access construction entrance off Ustick.
3. Lined cement washout located in southeast corner, will be lined.
4. No parking on bare lots is allowed.
5. Street sweeper attachment onsite
6. RP is onsite

Approved.
ESC13-01066 Site Preparation11/12/201311/13/201311/13/2013 9:00:53 AMAPASS
Travis Phone #: ###-####

Meeting and walk through with RP Travis. Permit is for townhouses in a larger common development.

1. Private stormwater drainage system is in process of installation, drop inlets will have filter bag protection.
2. Site features controlled access construction entrance off Ustick.
3. Lined cement washout located in southeast corner, will be lined.
4. No parking on bare lots is allowed.
5. Street sweeper attachment onsite
6. RP is onsite

Approved.