BLD14-00805
| FIRE-Final Inspection | 11/13/2014 | 11/13/2014 | 11/14/2014 4:22:42 PM | P | PASS |
|
|
Verified noted correction items for completion. Life safety finaled. No signature card available on site.
|
FIR14-00743
| INSP-Sprinkler Rough-in | 11/13/2014 | 11/13/2014 | 11/14/2014 4:21:29 PM | P | PART |
|
|
Verified added coverage per previous inspection notes.
|
BLD14-00452
| FIRE-Final Inspection | 11/12/2014 | 11/13/2014 | 11/14/2014 8:01:44 AM | A | PART |
|
|
C/N items include; relocation of the manual pull station for cooking hood #3- (ansul 7 at the FACP), need full trip test of the new dry system, post "door to remain..." signage at the main entry/exit, provide signage at the riser room door, replace missing ceiling tile at the sprinkler heads above the play area. One EM light and the fire sprinkler waterflow bell repaired while on site. Max occupant sign posted. Project related fire sprinkler and hood suppression system permit finals pending.
|
FIR14-00826
| INSP-Final Inspection | 11/11/2014 | 11/13/2014 | 11/14/2014 7:47:31 AM | P | PASS |
|
|
Hood suppression system functioned properly under test conditions. Permit finaled.
|
FIR14-00827
| INSP-Final Inspection | 11/11/2014 | 11/13/2014 | 11/14/2014 7:45:17 AM | P | PART |
|
|
Final pending relocation of the manual pull station to comply with IFC requirements. Functional testing and system monitoring passed.
|
FIR14-00667
| INSP-Final Inspection | 11/12/2014 | 11/13/2014 | 11/14/2014 7:42:39 AM | P | PART |
|
|
Fire sprinkler permit work passed final walkthrough- escutcheon replaced, tape and paper removed at service entrance head, outside waterflow bell repaired while on site. Sprinkler monitoring verified. Final pending full trip test of the new dry system valve- not completed due to weather conditions at the time.
|
FIR14-00730
| INSP-Sprinkler Rough-in/Hydro | 11/13/2014 | 11/13/2014 | 11/14/2014 7:38:49 AM | P | PASS |
|
|
Fire alarm testing completed satisfactory. Scope of work finished. Account information verified. Inspection passed.
|
FIR14-00261
| INSP-Sprinkler Rough-in | 11/12/2014 | 11/13/2014 | 11/13/2014 1:36:12 PM | A | PART |
|
|
Coverage at units where sprinklers are adjacent to surface mounted light fixtures to meet NFPA 13D 6.4.6.3.2.1, 6.4.6.3.2.2, 6.4.6.3.2.3.
|
FIR14-00782
| INSP-Sprinkler Rough-in | 11/13/2014 | 11/13/2014 | 11/13/2014 1:22:21 PM | P | PART |
|
|
Remainder of overhead fire sprinkler work at the remodel area approved for cover.
|
FIR13-00725
| INSP-Sprinkler Rough-in | 11/12/2014 | 11/13/2014 | 11/13/2014 12:38:02 PM | A | PART |
|
|
Rough-in okay for cover at the 1st and 2nd floor kitchen elevator lobby ceilings. Standpipe at the 1st thru 3rd floor levels NE stair also inspected for cover at the landing ceiling- discussed plan modification and alternate approval regarding location of hose valves at this stairway.
|
BLD14-01716
| FIRE-Final Inspection | 11/12/2014 | 11/13/2014 | 11/13/2014 10:38:15 AM | A | PASS |
|
|
Fire life safety inspection passed.
|
FIR14-00592
| INSP-Final Inspection | 11/13/2014 | 11/13/2014 | 11/13/2014 10:37:36 AM | A | PASS |
|
|
Fire sprinkler permit work finaled.
|
BLD14-03347
| FIRE-Final Inspection | 11/12/2014 | 11/13/2014 | 11/13/2014 10:36:36 AM | A | PASS |
|
|
Life safety inspection completed satisfactory.
|