ELE18-00435
| Final | 11/13/2018 | 11/13/2018 | 11/13/2018 4:01:49 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Candi Bahem... discussed with contractor that someone needs to be present to go over scope of work to final permit...rack system over panel shall be removed for final
|
ELE18-02232
| Final | 11/13/2018 | 11/13/2018 | 11/13/2018 3:24:26 PM | P | PASS |
|
|
call 15 mins ahead- Jose Phone #: ###-####...ok to final
|
ELE18-04321
| Final | 11/13/2018 | 11/13/2018 | 11/13/2018 2:45:04 PM | P | PART |
|
|
Homeowners should be home all afternoon. Please call ###-#### if no answer. Spa is located behind gate to right of garage. Homeowner has two small dogs. Phone #: ###-#### Inspection requested via web by Sean Patton...Hot tub connection ok ...permit to remain open until trellis/gazebo installed over tub
|
ELE17-03257
| Final | 11/13/2018 | 11/13/2018 | 11/13/2018 2:14:31 PM | P | FAIL |
|
|
Rocky Phone #: ###-####... 1..all exterior outlets shall be GFI protected and Weatther resistant 2..exterior outlets shall have correct covers 3..outlet for kitchen pennisula needs to be installed in correct location..210.52(C)(5) exception
|
ELE18-03674
| Conference | 11/9/2018 | 11/13/2018 | 11/13/2018 1:42:29 PM | P | PASS |
|
|
Brad Phone #: ###-####...discussed what wiring done...20A circuit for bathroom...A/C and furnace requirements...make up requirements and scheduling inspections...pamphlet over view
|
ELE18-04328
| Conference | 11/13/2018 | 11/13/2018 | 11/13/2018 12:55:07 PM | P | CANC |
|
|
call when on way out to meet // Mike Phone #: ###-####...talked with homeowner at 12:55 and said unable to make...in Nampa...He will reschedule when able to meet
|
ELE18-03202
| Final | 11/12/2018 | 11/13/2018 | 11/13/2018 12:36:28 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Ridley... 1...GFI protection for all receptacles in garage area..120V and 240V 2..exterior outlet needs backing plate 3..ventilation system needs installed and working 4..air compressor needs installed for power verification
|
ELE18-04123
| Final | 11/7/2018 | 11/13/2018 | 11/13/2018 11:31:37 AM | A | PASS |
|
|
CALL JEFF TO GET IN PLANT ###-#### Phone #: ###-#### Inspection requested via web by A.M.E. Office...job complete...verified power feed, distribution panel, and electrical install in new room. Disconnects, lighting, and exit signs complete...ok to final
|
ELE18-04342
| Electrical Rough-In | 11/9/2018 | 11/13/2018 | 11/13/2018 10:28:28 AM | A | PASS |
|
|
Elliott Shippy is the Electrician, please contact him. This is Underground inspection. Phone #: ###-#### Inspection requested via web by A.M.E. Office... under concrete slab...verified with electrical contractor...ok to cover
|
ELE18-03686
| Final | 11/9/2018 | 11/13/2018 | 11/13/2018 10:17:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Patrick Paz...ok to final
|
ELE18-03955
| Final | 11/9/2018 | 11/13/2018 | 11/13/2018 10:14:56 AM | A | PASS |
|
|
Call one hour ahead If onsite assistance is required. Phone #: ###-#### Inspection requested via web by Rob Maes... OCPD, labelling, and disconnect ok
|
ELE18-03955
| Electrical Rough-In | 11/13/2018 | 11/13/2018 | 11/13/2018 10:14:24 AM | A | PASS |
|
|
Call one hour ahead If onsite assistance is required. Phone #: ###-#### Inspection requested via web by Rob Maes... UL listed equipment verified with conference with installer...done on monday while Boise city was closed
|
ELE18-02962
| Final | 11/12/2018 | 11/13/2018 | 11/13/2018 9:24:54 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall... ok to final
|
ELE18-03376
| Final | 11/7/2018 | 11/13/2018 | 11/13/2018 8:56:48 AM | A | FAIL |
|
|
final on LED tubes Phone #: ###-#### Inspection requested via web by Tim Dunlop... rough inspection required for UL verification and access required for inspection inside
|
ELE18-03439
| Final | 11/13/2018 | 11/13/2018 | 11/13/2018 8:49:21 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher... ok to final
|
ELE18-03439
| Electrical Rough-In | 11/12/2018 | 11/13/2018 | 11/13/2018 8:48:55 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher... UL listing and disconnect verified
|
ELE18-02300
| Electrical Rough-In | 11/13/2018 | 11/13/2018 | 11/13/2018 8:48:55 AM | A | PASS |
|
|
Hard lids in bathrooms Phone #: ###-#### Inspection requested via web by Jason Parke... ok to cover
|
ELE18-04354
| Electrical Rough-In | 11/12/2018 | 11/13/2018 | 11/13/2018 8:02:56 AM | A | PASS |
|
|
I dont know which inspection type to mark, This is a ground works inspection, please attach to our other permit on this address. Offices were closed Monday the 12th so I could not ask what I needed to do to get a ground works inspection Phone #: ###-#### Inspection requested via web by Eric Schroeder... underground ok to cover
|