ELE19-04224
| Electrical Rough-In | 11/12/2019 | 11/13/2019 | 11/13/2019 2:57:25 PM | P | PASS |
|
|
r/i and ceiling // Jose Phone #: ###-#### Grid rough in ok cover
|
ELE19-04401
| Rough-In Permanent Service | 11/13/2019 | 11/13/2019 | 11/13/2019 2:16:06 PM | P | CANC |
|
|
Requesting inspection for the main house only rough in permanent service Phone #: ###-#### Inspection requested via web by Dean Gernaat Main house rough in only, service will be on garage not installed at time of inspection. Needed rough in on main house only.
|
ELE19-04401
| Electrical Rough-In | 11/13/2019 | 11/13/2019 | 11/13/2019 2:15:25 PM | P | PASS |
|
|
Requesting inspection for the main house only rough in permanent service Phone #: ###-#### Inspection requested via web by Dean Gernaat 225.32- A disconnecting means shall be provided either on the exterior or nearest point of entrance on a seperate structure. Sub-feed from garage service enters basement mechanical room LBs to metal flex to interior panel. Disconnect required on exterior or on interior where power enters basement. Contractor stated would be corrected as job continues. Main house only rough in ok cover.
|
ELE19-04357
| Final | 11/12/2019 | 11/13/2019 | 11/13/2019 1:16:09 PM | P | PASS |
|
|
furnace wiring ready for final. Owner said she would be home after 12:00 PM Phone #: ###-#### Inspection requested via web by Kelly Felin Final ok
|
ELE19-04357
| Electrical Rough-In | 11/13/2019 | 11/13/2019 | 11/13/2019 1:08:07 PM | P | PASS |
|
|
furnace wiring ready for final. Owner said she would be home after 12:00 PM Phone #: ###-#### Inspection requested via web by Kelly Felin Fed from solar array, fished in wall partially, and surface near unit. Rough in ok
|
ELE19-04142
| Final | 11/12/2019 | 11/13/2019 | 11/13/2019 11:09:50 AM | A | PASS |
|
|
electrician not onsite. can contact office for details. Phone #: ###-#### Inspection requested via web by Matthew White Final ok
|
ELE19-02282
| Final | 11/13/2019 | 11/13/2019 | 11/13/2019 10:23:27 AM | A | PASS |
|
|
This Kitchen Remodel Is Done And Ready For Ya Thanks So Much Phone #: ###-#### Inspection requested via web by jason shifflett Final ok
|
ELE19-04294
| Temporary Service | 11/12/2019 | 11/13/2019 | 11/13/2019 9:47:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|
ELE19-04327
| Rough-In Permanent Service | 11/12/2019 | 11/13/2019 | 11/13/2019 9:46:58 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Rough in ok cover p/s u/g n ok
|