FIR19-00589
| INSP-Sprinkler Rough-in | 11/13/2019 | 11/13/2019 | 11/13/2019 3:01:05 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover.
Rick Phone #: ###-####
|
FIR19-00521
| INSP-Sprinkler Rough-in/Hydro | 11/12/2019 | 11/13/2019 | 11/13/2019 3:00:25 PM | P | PASS |
|
|
Previously noted items have been corrected, rough to cover inspection for overhead fire sprinkler piping complete, foam insulation has been placed in the top cord pockets above the sprinkler piping so no tenting installed, cover is approved. Official hydro to be completed at a later date after permenant heat is established and operational as discussed.
Overhead rough, hydro, tenting. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD18-04349
| FIRE-Final Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 12:37:01 PM | P | PASS |
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags, area of work was occupied before inspection process was completed. Final life fire safety inspection for area of work complete, signature card not provided at time of inspection.
Daryl Phone #: ###-####
|
FIR19-00583
| INSP-Final Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 12:35:08 PM | P | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
Contact Noemi Carrero ###-#### 30 min prior to Final Fire Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR19-00779
| INSP-Sprinkler Rough-in | 11/13/2019 | 11/13/2019 | 11/13/2019 11:52:00 AM | A | PASS |
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
FIR19-00779
| INSP-Sprinkler Rough-in/Hydro | 11/12/2019 | 11/13/2019 | 11/13/2019 11:50:33 AM | P | PART |
|
|
Hydrostatic for underground supply witnessed, no pressure loss observed, water will be drained from stub in to building.
Underground Rough and Hydro, call James when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD19-04406
| FIRE-Final Inspection | 11/12/2019 | 11/13/2019 | 11/13/2019 11:04:29 AM | A | PASS |
|
|
Previously noted items have been corrected, no fire sprinkler, no fire alarms, fire extinguisher is in place with a current inspection tag, exit sign has been removed. Final life fire safety inspection for area of work complete.
Konda Phone #: ###-####
|
BLD19-03651
| FIRE-Conference | 11/12/2019 | 11/13/2019 | 11/13/2019 10:52:25 AM | A | DONE |
|
|
Fire conference is complete, fire alarm modifications will be required in the space, VR equipment to include headsets will need to shunt when a general fire alarm is activated.
Brendan Phone #: ###-####
|
FIR19-00802
| INSP-Sprinkler Rough-in | 11/12/2019 | 11/13/2019 | 11/13/2019 10:20:42 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00140
| INSP-Final Inspection | 11/8/2019 | 11/13/2019 | 11/13/2019 9:54:08 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please cal Jim @ ###-#### Phone #: ###-#### Inspection requested via web by Jim Shilton
|
FIR19-00671
| INSP-Final Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 9:13:25 AM | A | PART |
|
|
Final fire alarm inspection for phase 2 area complete.
|
FIR19-00671
| INSP-Alarm Testing | 11/12/2019 | 11/13/2019 | 11/13/2019 9:12:35 AM | A | PART |
|
|
Fire aalrm testing for phase 2 complete.
As early as possible Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|