Inspections for the day of: Wednesday, November 13, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00589 INSP-Sprinkler Rough-in11/13/201911/13/201911/13/2019 3:01:05 PMPPART
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover.

Rick Phone #: ###-####
FIR19-00521 INSP-Sprinkler Rough-in/Hydro11/12/201911/13/201911/13/2019 3:00:25 PMPPASS
Previously noted items have been corrected, rough to cover inspection for overhead fire sprinkler piping complete, foam insulation has been placed in the top cord pockets above the sprinkler piping so no tenting installed, cover is approved. Official hydro to be completed at a later date after permenant heat is established and operational as discussed.

Overhead rough, hydro, tenting. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD18-04349 FIRE-Final Inspection11/13/201911/13/201911/13/2019 12:37:01 PMPPASS
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags, area of work was occupied before inspection process was completed. Final life fire safety inspection for area of work complete, signature card not provided at time of inspection.

Daryl Phone #: ###-####
FIR19-00583 INSP-Final Inspection11/13/201911/13/201911/13/2019 12:35:08 PMPPASS
Final fire sprinkler inspection for area of work complete.

Contact Noemi Carrero ###-#### 30 min prior to Final Fire Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR19-00779 INSP-Sprinkler Rough-in11/13/201911/13/201911/13/2019 11:52:00 AMAPASS
Rough to cover inspection for underground supply complete, approved for cover.

FIR19-00779 INSP-Sprinkler Rough-in/Hydro11/12/201911/13/201911/13/2019 11:50:33 AMPPART
Hydrostatic for underground supply witnessed, no pressure loss observed, water will be drained from stub in to building.

Underground Rough and Hydro, call James when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD19-04406 FIRE-Final Inspection11/12/201911/13/201911/13/2019 11:04:29 AMAPASS
Previously noted items have been corrected, no fire sprinkler, no fire alarms, fire extinguisher is in place with a current inspection tag, exit sign has been removed. Final life fire safety inspection for area of work complete.

Konda Phone #: ###-####
BLD19-03651 FIRE-Conference11/12/201911/13/201911/13/2019 10:52:25 AMADONE
Fire conference is complete, fire alarm modifications will be required in the space, VR equipment to include headsets will need to shunt when a general fire alarm is activated.

Brendan Phone #: ###-####
FIR19-00802 INSP-Sprinkler Rough-in11/12/201911/13/201911/13/2019 10:20:42 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00140 INSP-Final Inspection11/8/201911/13/201911/13/2019 9:54:08 AMAPASS
Final fire alarm inspection for area of work complete.

Please cal Jim @ ###-#### Phone #: ###-#### Inspection requested via web by Jim Shilton
FIR19-00671 INSP-Final Inspection11/13/201911/13/201911/13/2019 9:13:25 AMAPART
Final fire alarm inspection for phase 2 area complete.
FIR19-00671 INSP-Alarm Testing11/12/201911/13/201911/13/2019 9:12:35 AMAPART
Fire aalrm testing for phase 2 complete.