BLD19-03209
| BLD-Ceiling Grid Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 4:04:37 PM | P | PART |
|
|
Building B // Tom Phone #: ###-####//grid looks ok//pending mechanical inspection//
|
BLD19-03261
| BLD-Framing/Rough-in | 11/12/2019 | 11/13/2019 | 11/13/2019 3:53:59 PM | P | FAIL |
|
|
PJ Phone #: ###-####//need passed sprinkler rough in//fix cut stud//add truss hanger//call for reinspection//
|
BLD19-04479
| BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 3:12:43 PM | P | PASS |
|
|
Need final Phone #: ###-#### Inspection requested via web by Chris Howell//roof appears to be installed within code requirements//
|
BLD19-04479
| DOC - Permit Finaled | 11/13/2019 | 11/13/2019 | 11/13/2019 3:11:51 PM | P | PASS |
|
|
|
BLD19-02502
| BLD-Footing | 11/12/2019 | 11/13/2019 | 11/13/2019 3:00:27 PM | P | PART |
|
|
Concrete schedule to show up at 4 P.M tomorrow. Phone #: ###-#### Inspection requested via web by David Snow//ok pending specials//
|
BLD19-00212
| BLD-Blower Door Test Results | 11/13/2019 | 11/13/2019 | 11/13/2019 2:44:29 PM | P | DONE |
|
|
4.7 ACH 50
|
BLD19-00212
| BLD-Final | 11/13/2019 | 11/13/2019 | 11/13/2019 2:43:15 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD19-00212
| DOC - Permit Finaled | 11/13/2019 | 11/13/2019 | 11/13/2019 2:43:06 PM | P | PASS |
|
|
|
MIS19-00364
| BLD-Conference | 11/6/2019 | 11/13/2019 | 11/13/2019 2:17:40 PM | A | DONE |
|
|
follow up work without permits....///permits obtained and finaled//
|
MIS19-00364
| DOC - Permit Finaled | 11/13/2019 | 11/13/2019 | 11/13/2019 2:16:43 PM | P | PASS |
|
|
|
BLD19-04431
| BLD-Final | 11/13/2019 | 11/13/2019 | 11/13/2019 2:16:33 PM | P | PASS |
|
|
Film was put on window to make tempered. Phone #: ###-#### Inspection requested via web by Viktoria McDonald//film installed for safety glazing//final complete//
|
BLD19-04431
| DOC - Permit Finaled | 11/13/2019 | 11/13/2019 | 11/13/2019 2:16:21 PM | P | PASS |
|
|
|
BLD19-04431
| BLD-Conference | 11/13/2019 | 11/13/2019 | 11/13/2019 2:14:39 PM | P | CANC |
|
|
Film was put on window to make tempered. Phone #: ###-#### Inspection requested via web by Viktoria McDonald
|
BLD19-03843
| BLD-Wall cover | 11/13/2019 | 11/13/2019 | 11/13/2019 1:59:31 PM | P | PASS |
|
|
Inspection requested via web by Brian Keeley
|
BLD16-01203
| BLD-Conference | 11/13/2019 | 11/13/2019 | 11/13/2019 1:43:31 PM | P | DONE |
|
|
Not building to plans // Doug White, ###-####//Permit shows expired on 11/13/2016// left CN//complaint was not building to plans//
|
BLD19-00553
| BLD-Framing/Rough-in | 11/13/2019 | 11/13/2019 | 11/13/2019 1:27:26 PM | P | PART |
|
|
call for access- Gary Phone #: ###-####//framing approved for existing conversion only//was discrepancies with previous inspection--walked through and ok to cover//will need to get certification/verification of pole structure by engineer as no inspections have been completed//
|
BLD19-00553
| BLD-Wall Bracing | 11/13/2019 | 11/13/2019 | 11/13/2019 1:25:41 PM | P | CANC |
|
|
call for access- Gary Phone #: ###-####
|
BLD19-00553
| BLD-Foundation | 11/13/2019 | 11/13/2019 | 11/13/2019 1:25:30 PM | P | NR |
|
|
Call for access- Gary Phone #: ###-####//gary will be getting back with me on the footings//engineer will need to verify structure as no inspections have been completed//
|
BLD19-02836
| BLD-Final | 11/13/2019 | 11/13/2019 | 11/13/2019 12:31:42 PM | P | PASS |
|
|
Angela Phone #: ###-####//corrections made//
|
BLD19-02836
| DOC - Permit Finaled | 11/13/2019 | 11/13/2019 | 11/13/2019 12:31:24 PM | P | PASS |
|
|
|
BLD19-00533
| BLD-Footing | 11/12/2019 | 11/13/2019 | 11/13/2019 11:40:27 AM | A | PART |
|
|
Pouring the footing for Building J tomorrow ( Wednesday) at 2pm. Phone #: ###-#### Inspection requested via web by Matt Perry//ok per plans pending specials//looked at footings for elevator as well--ok per details on structurals//
|
BLD08-00243
| BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 11:01:51 AM | A | FAIL |
|
|
David - please call for access Phone #: ###-####//need to add smoke carbon combos outside bedrooms to meet code requirements--appear to be interconnected//fix broken electrical outlet in basement//CN posted//
|
BLD19-00889
| BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 10:26:02 AM | A | FAIL |
|
|
Alex Phone #: ###-####//need blower door test//add step at door in garage//need fall prevention devices at windows with sill under 24" on 2nd floor//
|
BLD19-01655
| BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 10:08:08 AM | A | FAIL |
|
|
Alex Phone #: ###-####//need blower door test//need finals for mechanical and fireplace//
|
BLD19-03005
| BLD-Energy code compliance | 11/12/2019 | 11/13/2019 | 11/13/2019 9:48:51 AM | A | PASS |
|
|
bENJAMIN Phone #: ###-####//framing ok//insulation ok//no mechanical needed per Brian//
|
BLD19-04487
| BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 9:36:40 AM | A | PASS |
|
|
Walter Phone #: ###-####//new windows installed//exterior is sealed up//no changes in window size//
|
BLD19-04487
| DOC - Permit Finaled | 11/13/2019 | 11/13/2019 | 11/13/2019 9:35:56 AM | P | PASS |
|
|
|
BLD19-04195
| BLD-Energy code compliance | 11/12/2019 | 11/13/2019 | 11/13/2019 9:27:54 AM | A | FAIL |
|
|
Lucas Garcia Phone #: ###-####//wall with new door due to damage is not insulated//
|
BLD19-01619
| BLD-Framing/Rough-in | 11/12/2019 | 11/13/2019 | 11/13/2019 9:14:57 AM | A | PART |
|
|
Jean Phone #: ###-####//seal holes through floor//provide truss fix for cut gable trusses//ok to insulate only//
|
BLD18-02427
| BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 8:54:10 AM | A | FAIL |
|
|
George Phone #: ###-####//still need fall prevention devices on windows in master bedroom//ACH is still not posted//
|
BLD18-02896
| BLD-Aging Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 8:12:55 AM | | CANC |
|
|
|
BLD18-02635
| BLD-Aging Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 8:12:24 AM | | CANC |
|
|
Expires: 12/28/19
|
BLD18-02428
| BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 8:11:45 AM | A | CANC |
|
|
George Phone #: ###-####//spoke with George--still needs mechanical final for the gas fireplace//
|