Inspections for the day of: Tuesday, November 14, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-04218 Permanent Service11/14/200611/14/200611/15/2006 1:09:18 PMPFAIL
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called told contr he needs to check out kitchen shack wiring, and wire it then call for r/i inspection permit was for a R V comm. kit. shack
ELE06-04226 Electrical Rough-In11/14/200611/14/200611/15/2006 8:48:29 AMPPASS
Work performed by Tony Norton.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz
ELE06-02694 Final11/14/200611/14/200611/14/2006 4:46:42 PMPNH
scott, please call 1st for access; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt called left message for access no response had to leave the area
ELE06-04227 Electrical Rough-In11/14/200611/14/200611/14/2006 4:40:59 PMPNH
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles notice posted called house is boarded up
ELE06-03668 Electrical Rough-In11/13/200611/14/200611/14/2006 4:21:07 PMPPART
Jerod Note: underground; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles power and phone ok
ELE06-03978 Electrical Rough-In11/14/200611/14/200611/14/2006 4:01:23 PMPPART
UFER Ground inspection; Phone #: ###-#### Internet Inspection Request from: Alan Lusk ok for concrete
ELE06-02308 Final11/14/200611/14/200611/14/2006 3:38:51 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy corr. called 210.63 needs outside gfci recept fwithin 25ft of a/c unit
ELE06-03298 Electrical Rough-In11/14/200611/14/200611/14/2006 2:30:01 PMPPART
eric - bonding for spa ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith bond for spa set into ground ok still needs E grid ?
ELE05-03962 Rough-In Permanent Service11/14/200611/14/200611/14/2006 2:13:37 PMPCANC
Phone #: ###-#### Internet Inspection Request from: Ryan Christensen see added conf.
ELE05-03962 Conference11/14/200611/14/200611/14/2006 2:13:14 PMPDONE
Phone #: ###-#### Internet Inspection Request from: Ryan Christensen conference ok only
ELE06-03352 Electrical Rough-In11/13/200611/14/200611/14/2006 11:57:47 AMAPASS
ali ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok r/i p/s u/g new ok
ELE06-04218 Final11/13/200611/14/200611/14/2006 10:09:04 AMAFAIL
william ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
corr. called no final p/s 250.64(E) shall use kisted fiiting for GEC, 250.56 needs 2 grd rods, 250.24(A)(1) shall make connection between grd and neutral
ELE06-04127 Rough-In Permanent Service11/14/200611/14/200611/14/2006 10:06:32 AMAPASS
Scheduled by a contractor via Hello! on 11/14/2006 at 7:22:42 AM. Contact: ###-####. r/i ok p/s u/g new ok
ELE06-04206 Permanent Service11/14/200611/14/200611/14/2006 9:13:42 AMAFAIL
PLEASE CALL WHEN YOU ARE DONE. THANK YOU .CLAY-###-#### Internet Inspection Request from: Bob Glenn called needs plastic conn. for GEC needs #4 to u/g water system. seal KOs and install covers on elect furnace
ELE06-03796 Final11/13/200611/14/200611/14/2006 8:30:47 AMACANC
mike -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie called wrong address correct address is on lemp also p/s not final
ELE06-03542 Rough-In Permanent Service11/13/200611/14/200611/14/2006 8:13:42 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Daryl DeGrange r/i p/s o/h new ok