FIR07-00579
| FIR-Aging Inspection | 11/14/2007 | 11/14/2007 | 11/16/2007 4:56:12 PM | | NR |
|
|
work in progress
|
FIR07-00887
| INSP-Sprinkler Rough-in | 11/14/2007 | 11/14/2007 | 11/15/2007 10:28:49 AM | P | PASS |
|
|
The underground supply piping for the east building is ok for cover.
|
BLD07-00840
| FIRE-Final Inspection | 11/14/2007 | 11/14/2007 | 11/14/2007 4:11:09 PM | P | CANC |
|
|
See entry for this mornings inspection. Overbooked for this afternoon.
|
FIR07-00756
| INSP-Final Inspection | 11/14/2007 | 11/14/2007 | 11/14/2007 4:09:51 PM | P | CANC |
|
|
Contact is Trent Bice. Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
FIR07-00756
| INSP-Sprinkler Rough-in/Hydro | 11/14/2007 | 11/14/2007 | 11/14/2007 4:09:18 PM | P | CANC |
|
|
Contact is Ryan Jensen. Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
FIR07-00842
| INSP-Final Inspection | 11/13/2007 | 11/14/2007 | 11/14/2007 4:08:23 PM | P | PASS |
|
|
Permit finaled
|
BLD07-00840
| FIRE-Final Inspection | 11/14/2007 | 11/14/2007 | 11/14/2007 4:06:25 PM | A | FAIL |
|
|
Project was not ready for inspection. Exit lights were not finished, duct detectors and remote annunciators had not been installed and the building address was not installed. Inspection was stopped.
|
FIR07-00843
| INSP-Final Inspection | 11/13/2007 | 11/14/2007 | 11/14/2007 4:05:03 PM | P | PASS |
|
|
permit finaled
|
FIR07-00671
| INSP-Final Inspection | 11/13/2007 | 11/14/2007 | 11/14/2007 4:04:15 PM | P | PASS |
|
|
permit finaled per mike timmerman
|
FIR06-00367
| INSP-Final Inspection | 11/7/2007 | 11/14/2007 | 11/14/2007 11:34:52 AM | A | FAIL |
|
|
As per the previous correction notice plans need to be resubimitted showing the dact connected to the facp, fix the trouble signal on the facp, adjust and retest the tamper switches, provide updated map at the facp
|