Inspections for the day of: Wednesday, November 14, 2007.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00579 FIR-Aging Inspection11/14/200711/14/200711/16/2007 4:56:12 PM NR
work in progress
FIR07-00887 INSP-Sprinkler Rough-in11/14/200711/14/200711/15/2007 10:28:49 AMPPASS
The underground supply piping for the east building is ok for cover.
BLD07-00840 FIRE-Final Inspection11/14/200711/14/200711/14/2007 4:11:09 PMPCANC
See entry for this mornings inspection. Overbooked for this afternoon.
FIR07-00756 INSP-Final Inspection11/14/200711/14/200711/14/2007 4:09:51 PMPCANC
Contact is Trent Bice. Phone #: ###-#### Internet Inspection Request from: Trent Bice
FIR07-00756 INSP-Sprinkler Rough-in/Hydro11/14/200711/14/200711/14/2007 4:09:18 PMPCANC
Contact is Ryan Jensen. Phone #: ###-#### Internet Inspection Request from: Trent Bice
FIR07-00842 INSP-Final Inspection11/13/200711/14/200711/14/2007 4:08:23 PMPPASS
Permit finaled
BLD07-00840 FIRE-Final Inspection11/14/200711/14/200711/14/2007 4:06:25 PMAFAIL
Project was not ready for inspection. Exit lights were not finished, duct detectors and remote annunciators had not been installed and the building address was not installed. Inspection was stopped.
FIR07-00843 INSP-Final Inspection11/13/200711/14/200711/14/2007 4:05:03 PMPPASS
permit finaled
FIR07-00671 INSP-Final Inspection11/13/200711/14/200711/14/2007 4:04:15 PMPPASS
permit finaled per mike timmerman
FIR06-00367 INSP-Final Inspection11/7/200711/14/200711/14/2007 11:34:52 AMAFAIL
As per the previous correction notice plans need to be resubimitted showing the dact connected to the facp, fix the trouble signal on the facp, adjust and retest the tamper switches, provide updated map at the facp