BLD13-01592
| FIRE-Final Inspection | 11/14/2013 | 11/14/2013 | 11/14/2013 4:07:39 PM | P | CANC |
|
|
Rescheduled for monday per conversation with kathryn phone ####-####
|
BLD13-02811
| FIRE-Final Inspection | 11/12/2013 | 11/14/2013 | 11/14/2013 3:59:54 PM | A | PASS |
|
|
life safety passed
|
FIR13-00615
| INSP-Sprinkler Rough-in/Hydro | 11/14/2013 | 11/14/2013 | 11/14/2013 3:57:20 PM | P | PASS |
|
|
Permit finaled. Hood suppression operated correctly
|
BLD13-02715
| FIRE-Final Inspection | 11/12/2013 | 11/14/2013 | 11/14/2013 3:19:20 PM | P | PASS |
|
|
life safety is passed
|
FIR13-00432
| INSP-Sprinkler Rough-in | 11/14/2013 | 11/14/2013 | 11/14/2013 3:07:32 PM | P | PASS |
|
|
Underground supply piping is ok to cover. 8" run along the street will need to have fill nearly level with the street to meet the 4'6" bury requirement.
|
FIR13-00635
| INSP-Sprinkler Rough-in/Hydro | 11/14/2013 | 11/14/2013 | 11/14/2013 2:55:36 PM | P | PASS |
|
|
Permit finaled. Hood suppression system functioned correctly
|
FIR13-00515
| INSP-Sprinkler Rough-in | 11/14/2013 | 11/14/2013 | 11/14/2013 1:51:44 PM | P | PASS |
|
|
Sprinkler piping is ok to cover.
|
BLD13-02652
| FIRE-Final Inspection | 11/13/2013 | 11/14/2013 | 11/14/2013 11:37:07 AM | A | PASS |
|
|
life safety passed
|
BLD13-03028
| FIRE-Final Inspection | 11/14/2013 | 11/14/2013 | 11/14/2013 10:12:25 AM | A | PASS |
|
|
life safety passed
|
FIR13-00075
| INSP-Supply line flush | 11/13/2013 | 11/14/2013 | 11/14/2013 10:03:40 AM | A | PASS |
|
|
Underground lines flush on both sides of the building. Next inspection verify the check valve was changed to the correct direction.
|