Inspections for the day of: Thursday, November 14, 2013.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00182 Aging Inspection11/14/201311/14/201311/14/2013 2:17:21 PM PASS
Finaled.
ESC13-00182 DOC - Permit Finaled11/14/201311/14/201311/14/2013 2:17:04 PMPPASS
Exterior work appears complete. House is fully landscaped. No construction materials on site. ESC conditions have been met.
ESC12-00768 General Inspection11/14/201311/14/201311/14/2013 1:59:40 PM FAIL
Disturbed hillslope between house at 1350 and Hill Road (where new water line is) needs improved wattles/silt fence BMP until stabilization can occur.

Called RP Al Macmillan (homeowner RP) to notify of correction notice. ###-####
ESC13-00013 General Inspection11/14/201311/14/201311/14/2013 1:32:35 PM PART
Project near completion. ESC maintenance issues at site.

Corrections:
1. Sweep culdesac
2. Sweep/shovel dirt in gutter on Burnside down to Harcourt.

RP Robert Silva notified of corrections
ESC13-00151 Aging Inspection11/14/201311/14/201311/14/2013 1:06:34 PM PASS
Finaled.
ESC13-00151 DOC - Permit Finaled11/14/201311/14/201311/14/2013 1:06:04 PMPPASS
Project is complete. All other permits finaled. ESC permit conditions satisfied.
ESC13-00409 Aging Inspection11/14/201311/14/201311/14/2013 11:34:30 AM PASS
Finaled.
ESC13-00409 DOC - Permit Finaled11/14/201311/14/201311/14/2013 11:34:15 AMPPASS
Construction of addition is complete. Disturbed area has been stabilized and landscaped. ESC permit conditions have been met.
ESC13-00408 Aging Inspection11/14/201311/14/201311/14/2013 11:22:30 AM PASS
Finaled.
ESC13-00408 DOC - Permit Finaled11/14/201311/14/201311/14/2013 11:22:10 AMPPASS
Exterior work complete and stabilized. No further construction activity. BLD permit is open, but work appears to be done. No ESC corrections or further inspections required.
ESC13-00650 General Inspection11/14/201311/14/201311/14/2013 11:06:58 AM PASS
ESC13-00649 General Inspection11/14/201311/14/201311/14/2013 11:06:38 AM PASS
WIP. BMPs in acceptable condition. No trackout to Gowen or WPS access road.
ESC13-00719 General Inspection11/14/201311/14/201311/14/2013 10:53:30 AM PASS
No construction activity. Foundation for townhouse has been laid and prepped for vertical construction. BMPs are installed. No corrections at this time.
ESC12-00077 General Inspection11/14/201311/14/201311/14/2013 10:40:15 AM PASS
Finaled.
ESC12-00077 DOC - Permit Finaled11/14/201311/14/201311/14/2013 10:39:25 AMPPASS
Brighton Corp has issued NOT for the development on it CGP. Greater than 70% stabilization, all lots occupied/stabilized. As noted, this permit is for phase #3, not 2 (seperate permit already finaled). No further ESC inspections required.
ESC11-00525 Complaint Inspection11/14/201311/14/201311/14/2013 9:59:05 AMAFAIL
Corrections required:

1. Replace DI bags that are full ( Woodcarver & Sawmill, Woodcutter and Sawmill - alleyway and corner)
2. Concrete washout is full. Provide new washout or empty. Contain washout water - do not spill on ground.
3. Restrict access to empty lots - evidence of vehicles driving over curbs and mud

Called RP/Brighton inspector Danial Frisby ###-####