FIR14-00782
| INSP-Sprinkler Rough-in | 11/14/2014 | 11/14/2014 | 11/14/2014 5:16:52 PM | P | PART |
|
|
Okay to cover overhead fire sprinkler work at the SW common corridor grid ceilings.
|
FIR14-00668
| INSP-Sprinkler Rough-in | 11/13/2014 | 11/14/2014 | 11/14/2014 4:20:25 PM | P | PART |
|
|
Verified cold cavity protection, tenting at the second floor and first floor garage living areas. Heated enclosure has been built for the system supply and feed mains over the breezeway. Fire sprinkler rough-in okayed for ceiling cover.
|
BLD14-02264
| FIRE-Conference | 11/14/2014 | 11/14/2014 | 11/14/2014 12:15:36 PM | A | DONE |
|
|
On site discussion with contractor regarding project related fire sprinkler, alarm and hood suppression permit work. Life safety items and scope of remodel.
|
BLD14-01716
| FIRE-Final Inspection | 11/14/2014 | 11/14/2014 | 11/14/2014 12:04:53 PM | A | PASS |
|
|
Fire life safety final approved.
|
BLD14-02791
| FIRE-Conference | 11/14/2014 | 11/14/2014 | 11/14/2014 12:04:22 PM | A | DONE |
|
|
Regarding project schedule, related trade work, unfinished work at the SW corridor.
|
FIR14-00706
| INSP-Final Inspection | 11/14/2014 | 11/14/2014 | 11/14/2014 12:02:15 PM | P | CANC |
|
|
Please call 30 min prior to arrival. Phone #: ###-#### >> Inspection requested via web by Jeff Walton Inspection cancelled from web by: Jeff Walton
|
FIR14-00730
| INSP-Final Inspection | 11/14/2014 | 11/14/2014 | 11/14/2014 8:32:07 AM | A | PASS |
|
|
Fire alarm permit finaled.
|