Inspections for the day of: Friday, November 14, 2014.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00825 INSP-Sprinkler Rough-in11/14/201411/14/201411/14/2014 2:09:45 PMPPASS
Piping in conference room can be covered. I noted that a pendant head in the break room appears to be overspaced.
FIR14-00421 INSP-Sprinkler Rough-in11/14/201411/14/201411/14/2014 2:02:32 PMPPASS
Tenting passed. Piping can be covered.
FIR14-00584 INSP-Final Inspection11/13/201411/14/201411/14/2014 2:02:08 PMAPASS
Permit finaled
FIR14-00137 INSP-Sprinkler Rough-in11/13/201411/14/201411/14/2014 2:01:52 PMAPASS
Two additional pendant heads in the maternity area are ok to cover.
FIR14-00420 INSP-Sprinkler Rough-in11/13/201411/14/201411/14/2014 1:15:30 PMAPASS
Tenting repaired. Piping ok to cover
BLD14-03265 FIRE-Final Inspection11/13/201411/14/201411/14/2014 1:14:59 PMAFAIL
Provide exit discharge lighting as per approved plans
BLD14-03253 FIRE-Final Inspection11/13/201411/14/201411/14/2014 9:57:18 AMAFAIL
Repair office corridor exit signs
BLD14-03365 FIRE-Final Inspection11/13/201411/14/201411/14/2014 9:55:24 AMAPASS
life safety passed
BLD14-00452 FIRE-Final Inspection11/13/201411/14/201411/14/2014 8:56:38 AMAPART
A temporary occupancy is being given with Romeo's permission until a full trip of the dry system and the manual pull station has been relocated as discussed.