Inspections for the day of: Monday, November 14, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-03260 FIRE-Final Inspection11/14/201611/14/201611/14/2016 3:11:12 PMPPASS
LIfe safety passed. Milling machines have been moved in so I let the contractor know that this permit is not for an occupancy. And that a separate permit will be required.

Devon Phone #: ###-####
FIR16-00538 INSP-Final Inspection11/14/201611/14/201611/14/2016 3:09:41 PMPPASS
permit finaled
FIR16-00289 INSP-Final Inspection11/10/201611/14/201611/14/2016 2:15:25 PMPCANC
Call Anthony before heading out to confirm a time, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR16-00284 INSP-Sprinkler Rough-in/Hydro11/12/201611/14/201611/14/2016 1:59:56 PMPPART
Todays inspection was for the sprinkler rough-in for the first and second floors. The rough-in passed on the first floor and the piping in the resident rooms can be covered. However pendant drops have not been installed to the soffits and drop ceilings yet so they will need a re-inspection prior to a complete cover inspection being given. As far as the second floor the basic rough-in passed but piping can not be covered due to tenting not being completed. Again a second inspection will be needed when the soffits and drop ceilings have been installed. I noted that in atleast one location additional fitting had to be added which requires the plans, per a note on the drawings, to be resubmitted for hydraulic calculation verification. Also the second floor plans indicate the balconies are open to above but they actually have partial roofs over them. I spoke to sam and he will follow up with plan review on a plan of action.
NAF16-00057 INSP-Sprinkler Rough-in/Hydro11/14/201611/14/201611/14/2016 12:19:20 PMPCANC
Not ready for hydro test due to leak.

Please Contact Perly Daniels 30 minutes before inspection Phone #: ###-#### Inspection requested via web by Teri Cruickshank
NAF16-00055 INSP-Sprinkler Rough-in/Hydro11/14/201611/14/201611/14/2016 12:18:53 PMPPASS
Underground hydro test passed
BLD16-01665 FIRE-Final Inspection11/14/201611/14/201611/14/2016 12:18:24 PMPPASS
life safety passed
BLD16-01662 FIRE-Final Inspection11/14/201611/14/201611/14/2016 12:18:05 PMPPASS
life safety passed
BLD16-01664 FIRE-Final Inspection11/14/201611/14/201611/14/2016 12:17:49 PMPPASS
life safety passed
BLD16-01663 FIRE-Final Inspection11/14/201611/14/201611/14/2016 12:17:30 PMPPASS
life safety passed
BLD16-01660 FIRE-Final Inspection11/14/201611/14/201611/14/2016 12:17:11 PMPPASS
Life safety passed
BLD15-04006 FIRE-Final Inspection11/11/201611/14/201611/14/2016 8:37:32 AMACANC
Phone #: ###-#### Inspection requested via web by Chris Laraway
BLD16-03205 FIRE-Final Inspection11/10/201611/14/201611/14/2016 7:10:22 AMAPASS
Life safety passed
FIR16-00284 INSP-Sprinkler Rough-in/Hydro11/10/201611/14/201611/12/2016 8:59:20 AMACANC
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball