BLD16-03260
| FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 3:11:12 PM | P | PASS |
|
|
LIfe safety passed. Milling machines have been moved in so I let the contractor know that this permit is not for an occupancy. And that a separate permit will be required.
Devon Phone #: ###-####
|
FIR16-00538
| INSP-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 3:09:41 PM | P | PASS |
|
|
permit finaled
|
FIR16-00289
| INSP-Final Inspection | 11/10/2016 | 11/14/2016 | 11/14/2016 2:15:25 PM | P | CANC |
|
|
Call Anthony before heading out to confirm a time, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR16-00284
| INSP-Sprinkler Rough-in/Hydro | 11/12/2016 | 11/14/2016 | 11/14/2016 1:59:56 PM | P | PART |
|
|
Todays inspection was for the sprinkler rough-in for the first and second floors. The rough-in passed on the first floor and the piping in the resident rooms can be covered. However pendant drops have not been installed to the soffits and drop ceilings yet so they will need a re-inspection prior to a complete cover inspection being given. As far as the second floor the basic rough-in passed but piping can not be covered due to tenting not being completed. Again a second inspection will be needed when the soffits and drop ceilings have been installed. I noted that in atleast one location additional fitting had to be added which requires the plans, per a note on the drawings, to be resubmitted for hydraulic calculation verification. Also the second floor plans indicate the balconies are open to above but they actually have partial roofs over them. I spoke to sam and he will follow up with plan review on a plan of action.
|
NAF16-00057
| INSP-Sprinkler Rough-in/Hydro | 11/14/2016 | 11/14/2016 | 11/14/2016 12:19:20 PM | P | CANC |
|
|
Not ready for hydro test due to leak.
Please Contact Perly Daniels 30 minutes before inspection Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
NAF16-00055
| INSP-Sprinkler Rough-in/Hydro | 11/14/2016 | 11/14/2016 | 11/14/2016 12:18:53 PM | P | PASS |
|
|
Underground hydro test passed
|
BLD16-01665
| FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 12:18:24 PM | P | PASS |
|
|
life safety passed
|
BLD16-01662
| FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 12:18:05 PM | P | PASS |
|
|
life safety passed
|
BLD16-01664
| FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 12:17:49 PM | P | PASS |
|
|
life safety passed
|
BLD16-01663
| FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 12:17:30 PM | P | PASS |
|
|
life safety passed
|
BLD16-01660
| FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 12:17:11 PM | P | PASS |
|
|
Life safety passed
|
BLD15-04006
| FIRE-Final Inspection | 11/11/2016 | 11/14/2016 | 11/14/2016 8:37:32 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Chris Laraway
|
BLD16-03205
| FIRE-Final Inspection | 11/10/2016 | 11/14/2016 | 11/14/2016 7:10:22 AM | A | PASS |
|
|
Life safety passed
|
FIR16-00284
| INSP-Sprinkler Rough-in/Hydro | 11/10/2016 | 11/14/2016 | 11/12/2016 8:59:20 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|