Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-02156 FIRE-Final Inspection11/14/201611/14/201611/15/2016 7:49:07 AMPPASS
Fial life fire safety inspection passed/complete
BLD14-02889 FIRE-Final Inspection11/14/201611/14/201611/15/2016 7:47:45 AMPPASS
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place, addressing will be installed when recieved as well as stairwell signage (verified install payment be contractor invoice, signs will be installed when recieved) Final life fire safety inspection passed/complete.
BLD12-01330 FIRE-Alarm Testing11/10/201611/14/201611/14/2016 2:55:36 PMACANC
Alarm testing was for simplot world headquarters parking level.
FIR15-00198 INSP-Final Inspection11/14/201611/14/201611/14/2016 2:54:30 PMAPART
Fire alarm testing complete for heat and smoke detectors on the simplot world headquarters basement level.
BLD14-02173 FIRE-Alarm Testing11/10/201611/14/201611/14/2016 2:52:53 PMADONE
Fire alarm testing complete for heat and smoke detectors on the simplot world headquarters basement level.
BLD14-01824 FIRE-Final Inspection11/9/201611/14/201611/14/2016 10:29:19 AMAPART
Partial final life fire safety complete, final fire sprinkler inspection is complete, final fire alarm inspection is complete, fire extinguishers are in place with current inspection tags and knox box is in place. Building fire sub-panel reports to clubhouse main fire panel, life fire safety will be a partial pass until clubhouse is done and the inspection is finaled/passed.
FIR15-00785 INSP-Final Inspection11/10/201611/14/201611/14/2016 10:24:14 AMAPASS
Final fire alarm inspection passed/complete.
FIR15-00812 INSP-Final Inspection11/11/201611/14/201611/14/2016 10:22:53 AMAPASS
Final fire sprinkler inspection passed/complete
FIR16-00101 INSP-Sprinkler Rough-in11/11/201611/14/201611/14/2016 9:20:52 AMAPART
Rough to cover inspection for overhead fire sprinkler piping located above drop down hardlids in level 5 rooms complete, overhead fire sprinkler piping located in drop down hardlids on level 5 approved for cover. Overhead fire sprinkler piping located in service rooms around level 4 elevator lobby approved for cover.
BLD14-03207 FIRE-Final Inspection11/14/201611/14/201611/14/2016 12:00:00 AMPPASS
Final Fire Life Safety inspection complete.
FIR15-00727 INSP-Final Inspection11/14/201611/14/201611/14/2016 12:00:00 AMPPASS
Final Fire Sprinkler Inspection complete.
FIR15-00751 INSP-Final Inspection11/14/201611/14/201611/14/2016 12:00:00 AMPPASS
Final Fire Alarm inspection complete
FIR16-00127 INSP-Final Inspection11/14/201611/14/201611/14/2016 12:00:00 AMPPASS
Final Fire Alarm inspection complete
BLD15-01721 FIRE-Final Inspection11/14/201611/14/201611/14/2016 12:00:00 AMPPASS
Final inspection complete
BLD15-04496 FIRE-Final Inspection11/14/201611/14/201611/14/2016 12:00:00 AMPPASS
Final Fire inspection complete
BLD15-01519 FIRE-Final Inspection11/14/201611/14/201611/14/2016 12:00:00 AMPPASS
FIR16-00155 INSP-Final Inspection11/14/201611/14/201611/14/2016 12:00:00 AMPPASS
Final Fire inspection complete
FIR16-00067 INSP-Final Inspection11/14/201611/14/201611/14/2016 12:00:00 AMPPASS
Final Fire inspection complete