GRD16-00085
| FIRE-Final Inspection | 11/13/2017 | 11/14/2017 | 11/14/2017 10:57:50 AM | A | PART |
|
|
Today I viewed/approved the location of the two north most fire hydrants. I noted that there is to be 3'-0" clearance around the fire hydrants. The bollards are currently set around 2'-7" away. Fire dept approval is required or the bollards need to be relocated to comply with the IFC. Also Scott Arellano has approved the north most fire lanes 2'-0" reduced with per conversation with the engineer. Keever Phone #: ###-####
|
FIR17-00275
| INSP-Supply line flush | 11/14/2017 | 11/14/2017 | 11/14/2017 10:28:26 AM | P | CANC |
|
|
Cancel per Troy Phone #: ###-####
|
BLD17-00477
| FIRE-Final Inspection | 11/13/2017 | 11/14/2017 | 11/14/2017 9:52:03 AM | A | PASS |
|
|
Life safety passed
Keever Phone #: ###-####
|
BLD17-00466
| FIRE-Final Inspection | 11/13/2017 | 11/14/2017 | 11/14/2017 9:51:40 AM | A | PASS |
|
|
Life safety passed
Keever Phone #: ###-####
|
BLD17-00467
| FIRE-Final Inspection | 11/13/2017 | 11/14/2017 | 11/14/2017 9:51:20 AM | A | PASS |
|
|
Life safety passed.
|
BLD17-00566
| FIRE-Final Inspection | 11/13/2017 | 11/14/2017 | 11/14/2017 8:56:34 AM | P | PART |
|
|
Life safety for Phase I passed.
Please call 30 minutes prior to inspection Phone #: ###-#### Inspection requested via web by John Saucerman
|