Inspections for the day of: Wednesday, November 14, 2018.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-03005 ELE-Aging Inspection11/14/201811/14/201811/14/2018 2:20:02 PM DONE
text message to contractor, requesting follow up of final inspection
ELE18-03274 Electrical Rough-In11/12/201811/14/201811/14/2018 2:12:48 PMAFAIL
Install 1 sign reading Main + Marketplace, 8-ea 2nd floor elevation cabinets and 2-ea M logos. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### Inspection requested via web by Ken Olsen NEC 600.4 (A) Signs and outline lighting systems shall be listed; marked with the manufacturer`s name, trademark, or other means of indentification; and input voltage and current rating.
ELE18-03274 Final11/12/201811/14/201811/14/2018 2:01:32 PMANR
Install 1 sign reading Main + Marketplace, 8-ea 2nd floor elevation cabinets and 2-ea M logos. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### Inspection requested via web by Ken Olsen Not ready for final
ELE18-03173 Final11/13/201811/14/201811/14/2018 1:28:05 PMAFAIL
Phone #: ###-#### Inspection requested via web by TOM BICANDI NEC 250.52 Ground rod shall not be less than 8ft. in lenght. Supplemental Electrode thas be cut off.
ELE18-04362 Rough-In Permanent Service11/14/201811/14/201811/14/2018 12:07:17 PMPPASS
Phone #: ###-#### Inspection requested via web by Dan Rohl rough-in p/s u/g n ok
ELE18-04385 Electrical Rough-In11/13/201811/14/201811/14/2018 11:37:10 AMAPASS
For access please call Ed 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott rough-in ok cover kitchen remodel
ELE18-03297 Electrical Rough-In11/14/201811/14/201811/14/2018 11:10:35 AMAPASS
Phone #: ###-#### Inspection requested via web by Mark M Pediatric Intensive Care Unit rough-in ok ceiling grid