ELE13-03005
| ELE-Aging Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 2:20:02 PM | | DONE |
|
|
text message to contractor, requesting follow up of final inspection
|
ELE18-03274
| Electrical Rough-In | 11/12/2018 | 11/14/2018 | 11/14/2018 2:12:48 PM | A | FAIL |
|
|
Install 1 sign reading Main + Marketplace, 8-ea 2nd floor elevation cabinets and 2-ea M logos. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### Inspection requested via web by Ken Olsen NEC 600.4 (A) Signs and outline lighting systems shall be listed; marked with the manufacturer`s name, trademark, or other means of indentification; and input voltage and current rating.
|
ELE18-03274
| Final | 11/12/2018 | 11/14/2018 | 11/14/2018 2:01:32 PM | A | NR |
|
|
Install 1 sign reading Main + Marketplace, 8-ea 2nd floor elevation cabinets and 2-ea M logos. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### Inspection requested via web by Ken Olsen Not ready for final
|
ELE18-03173
| Final | 11/13/2018 | 11/14/2018 | 11/14/2018 1:28:05 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI NEC 250.52 Ground rod shall not be less than 8ft. in lenght. Supplemental Electrode thas be cut off.
|
ELE18-04362
| Rough-In Permanent Service | 11/14/2018 | 11/14/2018 | 11/14/2018 12:07:17 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Rohl rough-in p/s u/g n ok
|
ELE18-04385
| Electrical Rough-In | 11/13/2018 | 11/14/2018 | 11/14/2018 11:37:10 AM | A | PASS |
|
|
For access please call Ed 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott rough-in ok cover kitchen remodel
|
ELE18-03297
| Electrical Rough-In | 11/14/2018 | 11/14/2018 | 11/14/2018 11:10:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark M Pediatric Intensive Care Unit rough-in ok ceiling grid
|