BLD00-01341
| FIRE-Final Inspection | 11/14/2000 | 11/15/2000 | 11/15/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Reinsp Fail Flow alarm, Breaker lock, signs 11/15/2000 12:17:35 PM
|
BLD00-02625
| FIRE-Final Inspection | 11/15/2000 | 11/15/2000 | 11/15/2000 12:00:00 AM | P | FAIL |
|
|
###-####-paul ---fire fn Reinsp Fail Smoke seals 11/16/2000 7:55:42 AM
|
FIR00-00250
| INSP-Sprinkler Rough-in/Hydro | 11/15/2000 | 11/15/2000 | 11/15/2000 12:00:00 AM | P | PART |
|
|
###-####. OK spklr rough in on McDonalds and hydro test of riser #4 11/16/2000 7:59:16 AM
|
FIR00-00512
| INSP-Sprinkler Rough-in | 11/15/2000 | 11/15/2000 | 11/15/2000 12:00:00 AM | P | PART |
|
|
r/i-- ###-####-- becky OK on rough in for Dormers 11/16/2000 7:57:10 AM
|