Inspections for the day of: Thursday, November 15, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-03885 Temporary Service11/14/200111/15/200111/15/2001 12:00:00 AMAPASS
###-####. temporary service pole.

t/s ug bullet ele #3885-ok 11/15/2001 9:44:36 AM
ELE00-01560 Electrical Rough-In11/14/200111/15/200111/15/2001 12:00:00 AMAPASS
###-#### DAVE. 1st. floor: front lobby ceiling r/i. 3rd floor; computer room ceiling r/i. 4th floor corridor ceiling r/i. ok. 11/15/2001 9:12:02 AM
ELE01-03804 Electrical Rough-In11/14/200111/15/200111/15/2001 12:00:00 AMAPASS
###-#### andy. installed sub-panel; installed micro-wave branch circuit. 11/15/2001 10:27:58 AM
ELE01-03897 Temporary Service11/15/200111/15/200111/15/2001 12:00:00 AMPPASS
###-####. temporary service pole.

t/s ug cardinal inc. #3897-ok 11/15/2001 3:41:31 PM
ELE01-03555 Electrical Rough-In11/15/200111/15/200111/15/2001 12:00:00 AMPPASS
###-#### HAROLD. pvc conduit in trench; site lighting. ok. 11/15/2001 2:30:51 PM
ELE01-03724 Permanent Service11/15/200111/15/200111/15/2001 12:00:00 AMPPASS
###-#### GLENN. perm/svc corrections completedl

p/s ug n glenn ele #3724-ok. 11/15/2001 3:15:04 PM
ELE01-03521 Permanent Service11/15/200111/15/200111/15/2001 12:00:00 AMPPASS
###-####. perm/svc. relocated service from house to garage

p/s oh re centerline ele #3521-ok 11/15/2001 1:57:43 PM
ELE01-03873 Final11/15/200111/15/200111/15/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/15/2001 at 11:16:45. Contact: ###-####. kitchen remodel r/i. ok. 11/15/2001 2:50:11 PM