ELE01-03885
| Temporary Service | 11/14/2001 | 11/15/2001 | 11/15/2001 12:00:00 AM | A | PASS |
|
|
###-####. temporary service pole.
t/s ug bullet ele #3885-ok 11/15/2001 9:44:36 AM
|
ELE00-01560
| Electrical Rough-In | 11/14/2001 | 11/15/2001 | 11/15/2001 12:00:00 AM | A | PASS |
|
|
###-#### DAVE. 1st. floor: front lobby ceiling r/i. 3rd floor; computer room ceiling r/i. 4th floor corridor ceiling r/i. ok. 11/15/2001 9:12:02 AM
|
ELE01-03804
| Electrical Rough-In | 11/14/2001 | 11/15/2001 | 11/15/2001 12:00:00 AM | A | PASS |
|
|
###-#### andy. installed sub-panel; installed micro-wave branch circuit. 11/15/2001 10:27:58 AM
|
ELE01-03897
| Temporary Service | 11/15/2001 | 11/15/2001 | 11/15/2001 12:00:00 AM | P | PASS |
|
|
###-####. temporary service pole.
t/s ug cardinal inc. #3897-ok 11/15/2001 3:41:31 PM
|
ELE01-03555
| Electrical Rough-In | 11/15/2001 | 11/15/2001 | 11/15/2001 12:00:00 AM | P | PASS |
|
|
###-#### HAROLD. pvc conduit in trench; site lighting. ok. 11/15/2001 2:30:51 PM
|
ELE01-03724
| Permanent Service | 11/15/2001 | 11/15/2001 | 11/15/2001 12:00:00 AM | P | PASS |
|
|
###-#### GLENN. perm/svc corrections completedl
p/s ug n glenn ele #3724-ok. 11/15/2001 3:15:04 PM
|
ELE01-03521
| Permanent Service | 11/15/2001 | 11/15/2001 | 11/15/2001 12:00:00 AM | P | PASS |
|
|
###-####. perm/svc. relocated service from house to garage
p/s oh re centerline ele #3521-ok 11/15/2001 1:57:43 PM
|
ELE01-03873
| Final | 11/15/2001 | 11/15/2001 | 11/15/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 11:16:45. Contact: ###-####. kitchen remodel r/i. ok. 11/15/2001 2:50:11 PM
|