Inspections for the day of: Friday, November 15, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01862 BLD-Final11/14/200211/15/200211/15/2002 12:00:00 AMAPASS
###-#### ok for perm occ 11/15/2002 10:31:09 AM
BLD02-02159 BLD-Wall cover11/14/200211/15/200211/15/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/14/2002 at 11:26:14. Contact: ###-####. ok to cover 11/15/2002 9:19:46 AM
BLD02-02670 BLD-Footing11/14/200211/15/200211/15/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/14/2002 at 16:04:52. Contact: ###-####.
BLD02-02670 BLD-Foundation11/14/200211/15/200211/15/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/14/2002 at 16:05:25. Contact: ###-####. work in progress rebar is in forms 50% complete 11/15/2002 11:05:51 AM
BLD02-01474 BLD-Energy code compliance11/14/200211/15/200211/15/2002 12:00:00 AMAPASS
ok to cover have letter from briggs stating that they have reviewed the steel and beam framing and approved 11/15/2002 9:52:36 AM
BLD02-01693 BLD-Final11/15/200211/15/200211/15/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/15/2002 at 05:56:56. Contact: . c.c # 22607 issued 11/15/2002 9:17:03 AM
MEC02-02583 Final11/15/200211/15/200211/15/2002 12:00:00 AMAPASS
MEC02-02633 Final11/15/200211/15/200211/15/2002 12:00:00 AMAPASS
BLD02-02246 BLD-Footing11/15/200211/15/200211/15/2002 12:00:00 AMPPART
ready at 4 ###-#### builder needs to resubmit plans for new engineering has changed bearing walls and hold down locations told crew they could pour but at thier own risk 11/15/2002 2:10:11 PM
MEC02-02595 Final11/15/200211/15/200211/15/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/15/2002 at 11:16:47. Contact: ###-####.
MEC02-03365 Pressure Test11/15/200211/15/200211/15/2002 12:00:00 AMPPASS
BLD02-02643 BLD-Foundation11/15/200211/15/200211/15/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/15/2002 at 07:22:41. Contact: ###-####.
MEC02-03365 Rough-in11/15/200211/15/200211/15/2002 12:00:00 AMPPASS
kim ###-####
MEC02-03087 Rough-in11/15/200211/15/200211/15/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/15/2002 at 08:40:08. Contact: ###-####. crew used wrong gaurd plates for gas piping still need 6'' of clearance from singal wall vent pipe to side wall need to strape b-vent in atticc so it cant move back on to flix duct also return air duct is now been pinched reducing size so clearance can be maintained for bvent 11/15/2002 2:35:10 PM