Inspections for the day of: Thursday, November 15, 2007.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00887 INSP-Sprinkler Rough-in/Hydro11/15/200711/15/200711/16/2007 1:55:17 PMPPASS
The underground for the west building is ok to cover. I notified the general contractor and the fire sprinkler contractor that as with the east building, conduit should be installed prior to pavement so that the PIV tamper switch can be monitored.
BLD07-02790 FIRE-Final Inspection11/15/200711/15/200711/15/2007 4:38:18 PMPFAIL
A television is blocking a sprinkler head.
BLD07-00840 FIRE-Final Inspection11/15/200711/15/200711/15/2007 4:37:02 PMPPASS
Life safety passed.
BLD07-02731 FIRE-Final Inspection11/15/200711/15/200711/15/2007 1:24:52 PMPFAIL
Provide approved hardware on the mail room door, tag fire extinguisher and provide battery for the exit sign/emergency light.
FIR07-00896 INSP-Sprinkler Rough-in/Hydro11/13/200711/15/200711/15/2007 11:51:22 AMAPASS
The sprinkler piping in the lobby is ok to cover
BLD07-00840 FIRE-Final Inspection11/14/200711/15/200711/15/2007 10:29:53 AMAFAIL
Not all of the exit signs are functional and others are missing.
BLD07-01718 FIRE-Final Inspection11/14/200711/15/200711/15/2007 10:26:59 AMAPASS
life safety passed.
FIR05-00536 INSP-Sprinkler Rough-in11/14/200711/15/200711/15/2007 10:26:12 AMAPASS
The fourth floor piping at the connection between the north tower and the central tower is ok to cover.
BLD07-01634 FIRE-Final Inspection11/14/200711/15/200711/15/2007 9:30:41 AMPFAIL
Project was not ready for final inspection. I went over duct smoke detector requirements