Inspections for the day of: Monday, November 15, 2010.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00533 FIR-Aging Inspection11/15/201011/15/201011/17/2010 5:04:31 PM FAIL
No call for inspection.
FIR10-00410 FIR-Aging Inspection11/15/201011/15/201011/17/2010 4:51:46 PMPDEFR
To be completed in conjunction with project related FIR permits.
FIR10-00415 INSP-Alarm Testing11/15/201011/15/201011/16/2010 7:11:35 AMPPART
Notification testing at the basement level previously completed- ref. building permit activity notes.
BLD10-02586 FIRE-Final Inspection11/15/201011/15/201011/16/2010 7:10:01 AMPPASS
Life safety is acceptable pending an extinguisher with a current certification tag is provided as discussed- To be verified at structural final as agreed.
FIR10-00545 INSP-Sprinkler Rough-in11/15/201011/15/201011/16/2010 7:07:35 AMPDEFR
FIR10-00479 INSP-Sprinkler Rough-in11/12/201011/15/201011/16/2010 7:07:05 AMPPART
Overhead work okayed for cover. Ceiling at the comm room is not installed as shown on plan- upright coverage provided by the exisitng shell protection throughout.
FIR10-00510 INSP-Sprinkler Rough-in11/12/201011/15/201011/16/2010 7:03:38 AMAPART
New dry system piping at the cricket passed rough-in inspection. Two obstruction issues repaired while on site. See approved plan annotation for one area -the "entry element" not yet built including one dry pendent head and an upright not installed.
BLD10-02644 FIRE-Final Inspection11/12/201011/15/201011/15/2010 12:57:01 PMPPASS
Items on previous correction notice verified for compliance. Life safety finaled.
BLD10-01904 FIRE-Final Inspection11/15/201011/15/201011/15/2010 12:55:46 PMPPASS
Fire life safety completed satisfactory, inspection passed.
BLD10-01120 FIRE-Final Inspection11/15/201011/15/201011/15/2010 12:54:50 PMAPASS
Fire life safety inspection passed.
FIR10-00451 INSP-Final Inspection11/15/201011/15/201011/15/2010 12:54:07 PMAPASS
Fire sprinkler permit finaled.
BLD10-01904 FIRE-Conference11/15/201011/15/201011/15/2010 12:53:03 PMADONE
Conversation with contractor regarding project completion and inspection schedule.
FIR10-00567 INSP-Final Inspection11/12/201011/15/201011/15/2010 12:51:17 PMAPASS
Fire alarm work passed site inspection. Permit finaled.
FIR10-00564 INSP-Final Inspection11/12/201011/15/201011/15/2010 12:23:32 PMAPASS
Hood suppression system operated correctly under test conditions, inspection passed. Permit finaled.
FIR10-00380 FIR-Aging Inspection11/15/201011/15/201011/15/2010 7:48:19 AM DONE
Work in progress